Darıca School Street Tunnel Ends

Darıca School Street Tunnel is Finished: High Speed ​​Train construction continues to be divided into two sections of Darıca School Street and Topçular Street is connected to the lower gate.

Kocaeli Metropolitan Municipality completes the construction of the tunnel under the railway to cross the High Speed ​​Train route that divides School Street in Darıca. The railway connecting the school street and Topçular Avenue was connected by tunnel works. In the study which was started in the schools and the Topçular Streets, the bored piles were slid on both sides of the streets and a tunnel was built under the railway.

The tunnel, which was made in the form of a sinking out, was designed as two-way as a departure. Previously, there was room for the underpass in the street section of the railway. Following the bored piles, the middle section of the road was also included in the sank. Work was carried out on the floor of the tunnel where the tunnel sank. Wall panels were formed at the side of the tunnel.

Be the first to comment

Leave a response

Your email address will not be published.


*