32 Isparta

5th chair lift to Davraz

5th chairlift to Davraz: A tender was held for the construction of the 2th chairlift line with a length of 100 meters and a carrying capacity of 1500 people per hour to the ski center Davraz Mountain Culture and Tourism Protection and Development Zone in Isparta. Davraz Mountain Culture [more…]

53 Rize

Cable car project in Kaçkars

cable car project to Kaçkars: Rize Governor Erdogan Bektas, Kaçkar Mountains to bring the tourism activities in the region become more active in the national park, he said they completed the project of Turkey's largest cable car facility. Bektas, told reporters, 3 Kaçkar Row Mountains [more…]

RAILWAYS

MOTAŞ and its drivers

MOTAŞ and its drivers sitem: Expressing that there are some deficiencies of MOTAŞ and some drivers for disabled people, Naile Altuntaş, President of ANKA Disabled Platform, stated that the 'disabled ramp system for high-based buses' should be implemented in all buses. [more…]

RAILWAYS

Most identity and bank cards in Kayseri were forgotten

Identity and bank cards are mostly forgotten in Kayseray: In Kayseray, which is used by 120 thousand passengers daily in Kayseri, while citizens mostly forget their identity and bank cards, the presence of a literacy certificate among the forgotten items surprises those who see it. Kayseri Metropolitan [more…]

Intercity Railways

Railroad to Revive the Silk Road

Railway to revive the Silk Road: Gümüşhane Economic and Development Association (GİK-DER) President Selim Naz commented on the railway message given by Prime Minister Binali Yıldırım in Trabzon. Drawing attention to the importance of the emphasis on 23 tunnels of 2 kilometers, Naz said, “The Historical Silk Road [more…]

16 Bursa

Surprise application in Uludag Teleferik

Uludag surprising applications in the cable car: Turkey's most important tourism centers of winter and nature made in the hours of the cable car that provides one output to Uludağ, one of the changes was the reaction from citizens. With 176 cabins, a capacity of 500 passengers per hour, 9 kilometers [more…]

RAILWAYS

Ankara-Çorum-Samsun High Speed ​​Train Project

Ankara-Çorum-Samsun High Speed ​​Train Project: AK Party Çorum Deputy Uslu, "Samsun-Amasya-Çorum-Kırıkkale High Speed ​​Railway Survey Project is planned to be completed in 2017" AK Party Çorum Deputy Salim Uslu, Samsun-Amasya-Çorum-Kırıkkale High Speed ​​Railway He stated that the Survey Project is planned to be completed in 2017. Good, [more…]

34 Istanbul

Halkalı-Çerkezköy train services introduced

Halkalı-Çerkezköy train services introduced: for the presentation of train services Çerkezköy A promotional tour was organized with the participation of the protocol. 31 As of October 2016, the number of voyages to 2 Çerkezköy-Halkalı,Halkalı-Çerkezköy Promotion studies of the train services between are ongoing. PROMOTION TRIP ORGANIZED Train [more…]

35 Izmir

Traffic Revolt of Citizens in Izmir

Traffic Revolt of Citizens in Izmir: While the personnel of İZBAN A.Ş., which operates the suburban transportation between Aliağa and Torbalı in İzmir, continued to strike on the 7th day, the citizens rebelled. The personnel of İZBAN A.Ş., which operates the suburban transportation between Aliağa and Torbalı in İzmir, went on strike on its 7th day. [more…]

Cigli Tram Map
35 Izmir

New Route in Tram Cigli

New route on the tram Cigli: Konak and Karşıyaka Continuing the construction of trams, Izmir Metropolitan Municipality took another important step in the project. Ending in Mavisehir Karşıyaka line to Çiğli İZBAN Station, Katip Çelebi University and Atatürk Organized Industrial Zone [more…]

16 Bursa

Uludag Ropeway response to new working hours

The cable car line of the response to the new working hours Uludag: Turkey's most important winter tourism and natural changes to the hours of the cable car providing outputs to Uludağ, one of the centers received responses from citizens. Transport of 176 passengers per hour with 500 cabins [more…]

16 Bursa

T2 tramway work in Bursa has been ruined

T2 tram line work in Bursa was devastated: The tram line works on the Yalova road in Bursa suffered the citizens working in the region. Employees, who have to use the main road when the pedestrian road is canceled, face great danger among vehicles. Female employees [more…]

34 Istanbul

Countdown to the Eurasia Tunnel

The countdown for the Eurasia Tunnel has started: The Eurasia Tube Tunnel, which connects the two sides of Istanbul under the sea for the second time after Marmaray, will be put into service on 20 December. Transport, Maritime Affairs and Communications Minister Ahmet Arslan, in 2011 Railways, Ports and [more…]

34 Istanbul

When to Open 3. Airport

When Will The 3rd Airport Be Opened: President Recep Tayyip Erdoğan spoke at the Ship Farming Ceremony in Tuzla. Erdogan said, “We are opening the Eurasia Tunnel under the Bosphorus next month. Just before the coup attempt, we opened the Osman Gazi Bridge into service. Yavuz Sultan Selim in August [more…]

06 Ankara

Ankara YHT Railway Stationers Revolt

Ankara YHT Station Taksiciler revolts: Gar Taxi Stop taxi drivers, the new YHT station is not allocated to them in the front of the garage and the pretext of criminal proceedings in Ankara for the allegation of protesting in front of the Chamber of Tradesmen and Drivers Tradesmen Chamber [more…]

34 Istanbul

Marmaray and Metrobus grabbed 10 million ferry passengers

Marmaray and metrobus captured 10 million ferry passengers: Marmaray and metrobus, one of the giant projects of Istanbul, which are knitted with end-to-end transportation networks, received approximately 10 million passengers of the City Lines annually. Making an assessment on the subject, City Lines General [more…]

35 Izmir

The interview did not result, İZBAN's strike continues

No results came from the meeting, the İZBAN strike continues: The İZBAN strike continues on its 7th day. In the last meeting between the union and İZBAN management, an agreement could not be reached, workers said 'continue the strike'. In the İZBAN strike that started with equal pay for equal work [more…]

35 Izmir

The strike of the strike has damaged the workers' desired hike

The damage of the strike in Izban exceeded the hike that the workers wanted: On the 4th day of the strike in İZBAN, the citizens felt the traffic ordeal intensely. While the rate of raise requested by İZBAN workers from the Metropolitan Municipality will cost the Metropolitan Municipality an extra 650 thousand liras per year, the strike [more…]

RAILWAYS

Gaziantepe Metro Construction Released

Gaziantep Metropolitan Municipality Mayor Fatma Şahin announced approval for the construction of a subway in Gaziantep at the meeting, where he explained the Transportation Master Plan to the public bus and minibus owners serving in Gaziantep. Gaziantep Metropolitan [more…]

RAILWAYS

Logistic village support to Kocaeli industry

Logistics village support to Kocaeli industry: The industrial city of Kocaeli is preparing to stand out in the logistics sector. With 2 logistics villages to be established on Gebze and İzmit-Kartepe-Gölcük line, the load carrying capacity of the city will be increased from 600 thousand tons to 1.5 million tons. Kocaeli [more…]

Intercity Railways

Level Blocked Wall

The Wall Blocking Visibility At Level Crossing Was Demolished: The retaining wall that blocked the view of the railroad vehicles at the crossing at the crossing of Eskimalatya Train Station was demolished by TCDD. Eskimalatya Train Station, located in Dolamantepe Neighborhood, Bahçe Sokak, has been the scene of the accident in recent months. [more…]