Istanbul Ready for Winter with BEUS System

Istanbul Beus System
Istanbul Beus System

Thousands of 6 thousand 882 personnel and thousand 373 vehicles will serve to prevent disruption of life in Istanbul. 60 critical point of the city will be monitored continuously with the BEUS system, pre-icing measures will be taken to prevent accidents.

Istanbul Metropolitan Municipality (IMM), winter weather meeting held within the scope of the fight against adverse weather conditions yesterday. The meeting was held at the IMM Disaster Coordination Center (AKOM) with the participation of institutions and organizations providing services to the city hosted by IMM. IMM Deputy Secretary General Mehmet Murat Kalkanlı and Murat Yazıcı; Fire Brigade, Road Maintenance and Infrastructure Coordination, Support Services, Rail Systems, Police, Mukhtars and Food, Health Departments, AKOM, White Table and other related directorates, İETT, İSKİ, İGDAŞ, İSTAÇ, İSFALT companies and Provincial Security Directorate, Highways General Directorate, İGA Airport Operations, Yavuz Sultan Selim Bridge and ring road operator İCA company representative attended. At the meeting, all institutions serving Istanbul agreed to the importance of cooperation in order to prevent disruption in urban life by working in coordination.

400 RESPONSE POINT IS DETERMINED

At the meeting, efforts were made to ensure that the residents of Istanbul were not affected by the adverse conditions of the winter months and to continue the normal flow of city life. In the city, the 4 thousand 23 kilometers of road network in the area of ​​responsibility to determine the 400 intervention point IMM, snow shoveling and salting teams to keep the roads ready to remain open. Coordinated with the General Directorate of Highways teams connected to the Ministry of Transport, if needed, all kinds of support will be given.

Overpasses, bus stops, squares in public areas such as bags and boxes of salt puddles and icing will be kept by teams to intervene.

53 RECEIVER 24 RECEIVER

53 towing cranes will be kept ready for 24 hours in order to intervene in traffic closed due to vehicle accidents and slippages at critical points of Anatolian and European Side. Metrobus route to prevent any disruption 33 winter combat vehicle will work.

147 BLADE TRACTOR IS AT THE SERVICE OF VILLAGES

Attractive and rescuing vehicles on the main artery and surrounding roads will be kept ready, possible traffic accidents and stay on the road will be quickly intervened. To be used on the roads in the village, the headman will be given tractors with 147 shoveling apparatus and the roads away from the city center will remain open.

60 CRITICAL POINT TO BE FOLLOWED WITH BEUS

The 60 critical point will be monitored by BEUS (Icing Early Warning System) for effective combat in winter conditions. Salt bags (10 thousand tons) will be left for citizens to use at critical points and junctions throughout Istanbul.

Mobile buffets in heavy snowfall, emergency services of hospitals, piers and roads waiting for the drivers of hot drinks, soup and water will be served.

THE HELP OF THE HOMEWORK WILL BE RISKED

Shelter centers were also planned for people who did not have a specific residence due to their psychological, economic or social situation, who lived on the street or in abandoned spaces. Homeless citizens reported through 153 IMM White Table, 112 Emergency Call Center, Police Departments and Police; municipal police, police and ambulances will be taken after the health checks will be guests in IMM facilities. The guesthouses will be provided with facilities such as nutrition, shelter, basic health services, drug support service, self-care and hygiene, clothing aid and sending those who want to go to their hometown.

The Directorate of Veterinary Services will continue to provide food support to our dear friends who are adversely affected by winter conditions until the seasonal conditions improve.

ALL WORKS WILL BE COORDINATED FROM AKOM

The combat activities will be carried out under AKOM coordination. The vehicles will be made in the designated routes of the snow shoveling and road opening, the existing vehicle tracking system will be followed by AKOM, if necessary, vehicles will be directed to other regions.

Railway News Search

Be the first to comment

Comments