35 Izmir

Miscalculation in Izmir Metro

Wrong calculation in Izmir Metro: Izmir Metropolitan Municipality, which opened the metro without a fire detection and extinguishing system, incorrectly calculated the approximate cost in the tender opened to compensate for this deficiency. [more…]

35 Izmir

Robbery in İZBAN Line

Theft on İZBAN Line: 2 people were detained for allegedly stealing cables and rail bolts from the line in the İzmir Suburban System (İZBAN) between Cumaovası and Tepeköy. Izmir Suburb between Cumaovası and Tepeköy [more…]

34 Istanbul

Everybody use his energy for the suburbs

Everyone should use their energy for the suburbs: We used to take the suburban train from Izmit. The wagons were very old, they were run-down. The interior of the train was dusty and dirty. At some hours it was packed. Your feet were between the wagons. [more…]

34 Istanbul

Spanish delays for Marmaray

The Spanish delays to the Marmaray: Marmaray Halkalı and Gebze line extension works have come to a halt. After the financial problems of the contractor Spanish company slowed down the work, TCDD completed the work, which was planned to be completed in 2015. [more…]

RAILWAY

Motorway Route to be Extended as Habura

The Highway Route Will Be Extended to the End: Noting that the provinces in the region waited for years of service during the previous governments and that the necessary investments were made in the provinces during the AK Party period, Elvan said: [more…]