Kadikoy Tavsantepe Subway Times

Kadıköy Tavşantepe Metro Stations Route Duration
Kadıköy Tavşantepe Metro Stations Route Duration

Kadıköy Tavşantepe Metro Hours: 1 of the line. stage was completed in 2012 and opened to service with 21,7 station in 16 km section between Kadıköy and Kartal. With the construction of Yakacık-Adnan Kahveci, Pendik and Tavşantepe stations, 2. stage has been completed. 2. The length of the line increased to 26,5 km and the number of stations increased to 19. The average run time of the line is 82 minutes.

The line sits on D100 route in Acıbadem region starting from Kadıköy and following this route until Tavşantepe. There is an 52 vehicle (13 train) warehouse and maintenance workshop with a total 32 vehicle capacity on the line between Maltepe and Huzurevi stations and in the Maltepe Station area. The entire line, including warehouse and workshop sites, was built underground.

Kadikoy Tavsantepe Subway Times

(Sabah 06.00to the metro in Istanbul 24.00 until the time continues. Every 4 saves passengers time by having one trip per minute.

Kadıköy Tavşantepe Metro Station Structures

Tunnels of the line include TBM between Kadıköy - Kozyatağı and Kartal - Kaynarca; It was excavated by NATM method between Kozyatağı - Kartal. Bostanci Station has an additional rail line and two side platforms considering the need for alternative operation. All other stations were built as side platforms. The length of the station is 180 meters and it is suitable for the train operation with 8. There are 259 escalators and 70 elevators in the facility. Access is provided by 30 turnstile, designed to allow the passage of disabled passengers.

SYSTEM SAFETY AND SAFETY

Smoke and passenger evacuation scenarios have been prepared against the negative situations that may occur in Kadıköy Tavşantepe Metro Line and simulations related to these scenarios have been tested. With the total 991 cameras in the stations, the system is continuously monitored, controlled and inspected by security guards.

The signaling of the line and the storage area has a mobile communication based Mobile Block system. The signaling system is Thales CBTC system and trains have driverless parking.

All equipment used in the construction of the line is selected from materials that are resistant to high temperature and do not emit toxic gases. In the event of fire, to ensure the evacuation of the passengers as soon as possible and safely; There is a reliable smoke control and evacuation system in accordance with the standards, especially NFPA, which can operate fully automatically.

At the Kadıköy Tavşantepe Metro Line, the energy supply of the whole system is carried out from 3 separate points. If all three supply points fail, the generators at the 2 separate terminal are activated. With the activation of the generators, all trains in the tunnel are delivered to the nearest station and the passengers are evacuated. In case of failure of supply of energy and failure of generators; The lighting system and electronic control systems can be powered by uninterruptible power supplies for 3 hours.

Kadikoy Tavsantepe Metro Transfer Stations

  • Kadikoy Station, T3 Kadıköy - Moda Tram Line, city lines, sea buses and marine engines,
  • At Ayrılık Fountain Station, Marmaray,
  • At Ünalan Station,
  • In Pendik Station, transfer can be made to Pendik High Speed ​​Train Station via IETT buses.

Kadikoy Tavsantepe Metro Stations

  1. Kadikoy
  2. Ayrilik Cesmesi
  3. Bitter almond
  4. Ünalan
  5. Göztepe
  6. Yenisahra
  7. Kozyatağı
  8. Bostanci
  9. Küçükyalı
  10. Maltepe
  11. nursing home
  12. Rose water
  13. Esenkent
  14. Hospital-Justice
  15. Soganlik
  16. Kartal
  17. View Yakacik's Full Profile
  18. Pendik
  19. Tavşantepe

Map of Kadikoy Tavsantepe Metro

Railway News Search

Be the first to comment

Comments