marmaray trains
34 Istanbul

Increased Seaway Number in Marmaray

Minister of Transport and Infrastructure Cahit Turhan stated that the railway line arrangement works between the Ayrılık Çeşmesi-Söğütlüçeşme stations of Marmaray have been completed, and said, “So, Marmaray flights, which are made every 10 minutes, are now 5, 7 and 10 minutes. [more…]

01 Adana

Get your Kentkart!

Adana Metropolitan Municipality, students who will continue their higher education at Çukurova University from the first day of enrollment in the public transport provided a discount. Adana Metropolitan Municipality, Çukurova University 8 thousand [more…]

GENERAL

Tunnel Excavations Started at Köseköy Junction

Work is underway at the Köseköy Junction, which was built to ease the D-100 city crossing in Kocaeli. The intersection, which is being implemented by Kocaeli Metropolitan Municipality, is one of the important points in D-100 due to its connection to Kartepe district center. [more…]

381 Kosovo

Train Trolley in Kosovo: 2 Dead, 4 Injured

Drenas'ta crossing the vehicle crossing the passenger train hit the level crossing. 2 people were killed in the car that was dragged to the train by meters, two of them were seriously injured by 4 children. Accident Yesterday at 18: Drenas's at 48 [more…]

34 Istanbul

90 Percent of Mecidiyeköy-Mahmutbey Metro Construction is Finished

It is stated that 2014 percent of the subway construction, which has reduced construction between Mecidiyeköy and Mahmutbey, which has been under construction since 26, is completed and the line will open at the end of 90. KabataşStarting from Mecidiyeköy-Çağlayan-Kağıthane-Nurtepe-Alibeyköy-Yeşilpınar-Veyselkarani-Akşemsettin-Kazim Karabekir-Yenimahalle-Karadeniz District-Tekstilkent-Yüzyıl-Göztepe Mahallesi-Mahmutbey route. [more…]

canakkale
17 Canakkale

Signature Campaign for Traffic Problem

In the signature campaign launched at Change.org, a subway, suburban or tramway is being built to address the traffic problem of Çanakkale. In the article in the Signature Campaign launched; Toplu The biggest problem of Çanakkale is the collective [more…]