
About Kadiköy Kartal Metro
Its construction started in 2008 and KadıköyThe length of the metro, which will serve between -Kartal, is approximately 22,7 km and has 16 passenger stations. Maltepe and Nursing Home on the line [more…]
Its construction started in 2008 and KadıköyThe length of the metro, which will serve between -Kartal, is approximately 22,7 km and has 16 passenger stations. Maltepe and Nursing Home on the line [more…]
Kadıköy, Ayrılıkçeşme, Acıbadem, Ünalan, Göztepe, Yenisahra, Kozyatağı, Bostancı, Küçükyalı, Maltepe, Huzurevi, Gülsuyu, Esenkent, Hospital/Courthouse, Soğanlık, Kartal stations. The demand for public transportation on the Anatolian Side of Istanbul [more…]
Interest in the Rail Systems Engineering Department, which opened last year and is only located at Karabük University in Turkey, is increasing. The department, which started education with 99 students last year, added 130 students this year. [more…]
© All rights of the published news and photographs belong to ÖzenRay Railway Ltd.
© None of the articles published on the site cannot be published without the permission of the copyright owner.
Designed & by SEO Levent Özen | Copyright © RayHaber | 2011-2025