07 Antalya

No Fast Train Response

No Response to the High-Speed ​​Train: While CHP Antalya Deputy Çetin Osman Budak brought up the high-speed train project with Antalya's connection with the surrounding provinces, Deputy Prime Minister Lütfi Elvan said: [more…]

16 Bursa

Why there is no train in the Bay Bridge Project

Why is there no train in the Gulf Bridge Project? In the initial plans of the Gulf Bridge, which is described as the project of the century, it was planned to connect Istanbul, Yalova-Bursa by train, but the train passage over the bridge was canceled during the construction phase. [more…]

25 Erzurum

Avalanche drill

Avalanche drill in Palandöken. AFAD and Gendarmerie Search and Rescue (JAK) teams, who work on a 24-hour basis during the winter season in Palandöken, one of Turkey's leading ski resorts, performed an avalanche drill. [more…]

Intercity Railways

Level Crossings Inspected in Manisa

Level Crossings were Inspected in Manisa. Km between Manisa and Turgutlu Stations. The work done at the level crossing at 66+880 was inspected. Km between Manisa and Turgutlu Stations. At the level crossing at 66+880 [more…]

GENERAL

Acknowledgment to the President

Thanks to the President of the Railway Labor Union: Tüdemsaş General Manager and Sivas Demirspor Club President Yıldıray Koçarslan, "From the Past" organized within the scope of the 75th anniversary of the establishment of Sivas Demirspor Club [more…]

GENERAL

Eyes for TÜVASAŞ 14 in January

All eyes are on January 14 for TÜVASAŞ. While applications are ongoing for 27 permanent workers with high school degrees to be recruited to the Turkish Wagon Industry, what is wondered is the number of applications to be made outside Sakarya. This [more…]