Working Day and Night for Konya Infrastructure

Konya Metropolitan Municipality KOSKİ General Directorate successfully completed important infrastructure projects throughout the city in 2023.

KOSKİ, whose total number of subscribers reached 31 million 669 thousand 384 in 494 districts within its area of ​​responsibility, 470 thousand 1 of which are in the center and 163 thousand 854 in the districts, has also carried the living standards in the center to the districts. KOSKİ constructed a total of 2023 kilometers of canal network lines and 50 kilometers of water network lines throughout Konya in 112.

WATER AND WASTEWATER UNDER CONTROL

Konya Metropolitan Municipality KOSKİ General Directorate, which has been working hard to strengthen Konya's water and sewage infrastructure, checked the water quality by making 8 thousand 723 analyzes in the accredited drinking water treatment facility laboratory last year. 1.572 analyzes were carried out in wastewater treatment plants.

AGRICULTURAL IRRIGATION INVESTMENT OF 45 MILLION TL

In addition to all these, KOSKİ continued its agricultural irrigation investments in order to support the production of citizens living in rural areas. KOSKİ, with the support of KOP in 2023, will amount to 45 million lira; It completed the construction of irrigation ponds, closed system diversion facilities and solar energy systems, closed system irrigation facilities and animal drinking water ponds and introduced them to farmers.

ENVIRONMENT-FRIENDLY INVESTMENTS ARE INCREASING

Konya Metropolitan Municipality KOSKİ General Directorate, which has expanded wastewater treatment facilities by giving priority to environmentally friendly investments, contributed to agricultural production with the waste sludge obtained from here. KOSKİ, which obtained 2023 thousand 28 tons of sludge from 30 biological treatment facilities in 58, made these sludge available to farmers.