RAILWAYS

Electricians Drowned in Electric Current

Worker Suffered from Electric Current in YHT Construction Died: 22-Year-Old Mahmut Hammer, who was working in the Construction of High Speed ​​​​Train (YHT) in Yıldızeli District of Sivas, Lost His Life As A Result of Electric Shock. High Speed ​​in the Yıldızeli district of Sivas [more…]

06 Ankara

Parla tunnel drilling completed

Parla tunnel drilling process completed: High Speed ​​Train (YHT) construction in Geyve district of Sakarya Parla tunnel drilling process was completed. According to the information received from the authorities Ankara-Istanbul high-speed train project [more…]

34 Istanbul

Work on Ankara YHT

Works on the Ankara-Istanbul YHT line: TCDD General Manager Süleyman Karaman came to Bilecik with the test train to conduct inspections on the Eskişehir-Istanbul high-speed train (YHT) line construction. YHT construction in Bilecik Station neighborhood and [more…]

06 Ankara

YHT machine work machine burned

Heavy machinery on the YHT line burned: The construction machine on the construction of the High Speed ​​Train line, which is expected to open at the end of March, was burned for some unknown reason. Rows of fire at night time 22.00 [more…]

RAILWAYS

4 detained cable from YHT construction

4 person who stole cable from YHT construction was arrested: 4 person who tried to load the porter and copper cables stolen from the high-speed train line in Oruçlu village to the vehicle was noticed by the gendarmerie teams who were on patrol. escape [more…]

RAILWAYS

19 Fall Young Yht Construction

19-Year-Old YHT fell from construction: The 19-year-old, working in the construction of the High Speed ​​Train (YHT) in Geyve district of Sakarya, lost his balance and fell from the height of 5 meters. According to information obtained, Geyve'de [more…]

RAILWAYS

Burned people won the Burn Stone Quarry case

The people of Yanık won the case of the Yanık Stone Quarry: The people of Yanık, who brought the Yanık Stone Quarry, which is planned to be opened for the supply of the filling material of the YHT construction, to the court, won the case. About Burn Mutari Sibel Baykal [more…]

RAILWAYS

YHT trucks crashed roads

YHT trucks crashed the roads: Although the shortages of construction work carried out within the borders of Kocaeli regarding the High Speed ​​Train (YHT) that Prime Minister Erdoğan instructed to make his first voyage in October, 29 [more…]

RAILWAYS

Do not close the lower passage

Do not close the underpass The ongoing High Speed ​​Train (YHT) construction has accelerated. 29 is now in Izmit Railway Station with a series of regulations regarding the HTL line planned to open in October. [more…]

GENERAL

YHT construction accident

Accident in the construction of YHT As a result of the accident of the car that entered the construction of the High Speed ​​​​Train Line (YHT) in Kocaeli's Gebze district, 1 person died and 1 person was injured. According to the information received, Kurtuluş Aydoğdu [more…]

34 Istanbul

Line 200 Now in Eagle Metro

200 Line No: 200, which was put into operation in Kocaeli Metro due to high speed train works by Kocaeli Metropolitan Municipality, was extended to Kartal Metro. From all stops on D-100 within Istanbul [more…]

RAILWAYS

YHT in the Republic of Turkey Corrects

YHT Corrects Corrupt Republican Neighborhood Prime Minister Recep Tayyip Erdogan and the AKP government attaches great importance to the 'National Project' High Speed ​​Train (YHT) project is moving with great speed. YHT during construction [more…]

RAILWAYS

YHT works on the trucks

YHT construction of trucks working in the district of Sakarya Sapanca district of the summer months with the arrival of the District Gendarmerie Command increased the control of traffic teams. Traffic teams of the District Gendarmerie Command within the scope of responsibility [more…]

11 Bilecik

Protest Action on YHT Line in Bilecik

Protest Action to YHT Line in Bilecik Citizens living in Demirköy, in the Pazaryeri district of Bilecik, protested, claiming that the YHT line was blocked from connecting a neighborhood to the village. Ankara-Istanbul High School, which is under construction in Bilecik [more…]

RAILWAYS

YHT pond | Kocaeli

YHT pond YHT road works are ongoing. Due to this railway construction work, the contractor opened a pit near Körfez Atalar Quarter İstasyon Mosque. This pit turned into a lake. Around [more…]