Uskudar - Umraniye - Cekmekoy - Sancaktepe Metro Line

Istanbul Metropolitan Municipality, Üsküdar and Sancaktepe between 24 minutes to download the 20 kilometers to the metro line to the world was a tender. The tenders submitted by the 7 group are currently being reviewed by the Tender Commission. The line is planned to be put into service in a short time such as 38 month by signing a new world record.

The estimated cost of the job was announced as 725 million 114 thousand 250 euros before the bids were announced during the tender. The firms participating in the tender and the cost proposals are as follows;

1- Building Center Construction Industry Co. 617 million 789 bin 934 EURO 34 cents
Coopsette Soc. Coop + -Unieco Soc. Coop + Coperativa Muratori E Braccianti Di Capri Business Partnership 796 million 496 bin 324 EURO 63 cents.

2- Doğuş Construction and Trade Corporation 563 million 899 bin 995 EURO 32 cents.

3- Gülermak Heavy Industry Construction and Contracting Inc. + Mak-Yol Construction Industry Tourism and Trade Inc. + Alsim Alarko Sanayi Tes. and Trade Corporation Business Partnership 609 million 120 thousand EURO.

4- Mapa Construction & Trade Corporation + China Mojor Bridge Engeneering Partnership 587 million 656 bin 206 EURO.

5- Nurol Construction and Trade Inc. + Moskovskiy Metrostory Open Inc. Central Russia.

6- Turkey Business Association Istanbul Branch thousand 624 825 937 million euros.

7- Güriş İnşaat ve Mühendislik A.Ş + Smp Almaty Business Partnership 829 million 488 thousand 12 EURO Within the scope of “Üsküdar-Ümraniye-Çekmeköy-Sancaktepe Metro tender with 20 kilometers length and 16 stations, all construction and electromechanical works of the line will be carried out in one hand and quickly. The foundation of the subway construction will start in a very short time. The journey between Üsküdar and Sancaktepe will be reduced to 2 minutes after the metro, which will include 750 thousand 24 meters connecting tunnels connected to the warehouse area and the warehouse, is completed.

Üsküdar-Sancektepe Metro, Kadıköy- It will also take the record of the Eagle Metro. Kadıköy-Kartal Metro is about to be completed in a record time of 45 months. It is aimed to complete the Üsküdar Metro in 38 months and present it to the service of Istanbul residents with a new world record.
Stations: Üsküdar, Fıstıkağacı, Bağlarbaşı, Altunizade, Kısıklı, Libadiye, Çarşı, Ümraniye, İmkilap mah. Çakmak, Ihlamurkuyu, Altınşehir, High School, Dudullu, Mass Housing, Çekmeköy-Sancaktepe.

Travel times from Sancaktepe

Üsküdar: 24 min.
Kartal: 59 min.
Yenikapi: 36 min.
Taksim: 44 min.
Hacıosman: 68 min.
Airport: 68 min.
Olympic Stadium: 78 min.

Source: IMM

 

Be the first to comment

Leave a response

Your email address will not be published.


*