Malatya-Elazığ-Diyarbakır High Speed ​​Train Project

The button was pressed for the Malatya-Elazığ-Diyarbakır high-speed train project. Malatya Elazığ high-speed train project service procurement process has started. Öznur Çalık, Deputy Chairman of the AKP and Malatya MP said, ı As the first step for the Malatya-Elazığ-Diyarbakır high-speed train project, Malatya-Elazığ Railway infrastructure, superstructure, electromechanical survey project and consultancy services were procured by TCDD General Directorate. Başkan .

PROJECT TENDER IS IN 12 OCTOBER ..
Malatya - Elazığ Railway (Infrastructure, Superstructure, Electromechanics) Survey, Project and Consultancy Services tender procurement announcement was published by TCDD General Directorate. 540 calendar will be completed on the day of the tender, 12 October 2017 Headquarters building in Ankara will be recorded.

The tender announcement included the following information:

Danışmanlık Malatya - Elazığ Railway (Infrastructure, Superstructure, Electromechanics) Surveying, Design and Consultancy Services
Candidates with sufficient experience for pre-qualification
is invited to apply.

In the pre-qualification specification among those identified as a result of the pre-qualification evaluation
will be invited to submit a short list by ordering according to the specified criteria
in accordance with the provisions of the 4734 part of the Law No. 5 with the participation of the bidders.
tender between tenderers.

Quality, type and quantity: Survey, project and consultancy services for approximately 121 km railway
Location: Malatya, Elazığ
Duration of work: 540 is the calendar day from the date of commencement.

It was learned that the High Speed ​​Train project will continue until Diyarbakir and the drilling and surveying works started on the route where the railway will be built.

”FIRST STEP ATTACHED ..“
Mr. Öznur Çalık, Deputy Chairman of the AKP and Malatya MP, stated that works have been started for the fast train project between Malatya and Diyarbakır. ”Another promise of our President Mr. Recep Tayyip Erdoğan to the Malatians, the Elazığ people and Diyarbakır people is realized and the project tender has been started for the high speed train. Im

Calik; "Turkey is enlarging, prosperity between the regions, we aim to bring equal points. Under the leadership of our President, Mr. Recep Tayyip Erdogan, Turkey is a great love of our country embroidery with large projects in each area are being processed in each region. The President of the Republic of Turkey, Recep Tayyip Erdogan, Malatya, Elazig, Diyarbakir, citizens were promised high-speed train. High speed train projects between Sivas and Malatya have reached the final stage. The first step for the Malatya-Elazığ-Diyarbakır high-speed train project was the procurement of infrastructure, superstructure, electromechanical survey projects and consultancy services for Malatya-Elazığ Railroad by the General Directorate of TCDD. On the 121 October 12 for the 2017 kilometer railway survey and project, pre-qualification proposals will be received. Then, it is aimed to announce the tender announcement in October for the high speed train railway project between Elazığ and Diyarbakır.

As the power of the AK Party, on the one hand we continue our struggle with the terrorist organizations in our country and our geography, on the other hand, we are in the effort to bring the great investments with our people. We would like to thank our President, Mr. Recep Tayyip Erdoğan, who started the works with the instructions to bring the high speed train project to the people of our region, to our Prime Minister Mr. Binali Yıldırım, who closely followed the project, and to Ahmet Aslan, Minister of Transport, Maritime Affairs and Communications. Hızlı

Çalık said, em We do not stop any big projects for the welfare of our people despite all the negativity to be kept alive in our country and in our geography, but we mobilize all opportunities to implement our projects. We're not stopping, we're on our way. We do not stop, do not step back, do not fall into pessimism, we are bringing together our large projects with our citizens in the region. Or

Source: malatyahaber

2 Comments

  1. This road should be considered as Samsun-batman and integrated into YHT in Sivas. Thus, a passenger departing from Samsun or Batman in the morning can be in Ankara after noon and in Istanbul, Izmir and Bursa in the afternoon. It is a very important project for the region and country. It should be completed and put into operation as soon as possible.

  2. a small but effective project was another lie ..

Leave a response

Your email address will not be published.


*