Istanbul-Izmir Highway Route

istanbul izmir motorway opens today with the participation of president erdogan
istanbul izmir motorway opens today with the participation of president erdogan

The last section of the Istanbul İzmir Highway, which will be one of the important transportation axes connecting the Marmara Region to the Aegean Region, Western Mediterranean and Western Anatolia Region, was opened by President Recep Tayyip Erdoğan on Sunday, 192, at 4.8.2019:16. .

In order to connect the Marmara Region to the Aegean Region, the construction of the Istanbul Bursa İzmir Highway, which was started in 2010, was approached to an end. 83 kilometers of main body, 9 kilometers of the connection road, including the total 192 kilometer section will be opened tomorrow. 8 hours the route from Istanbul to Izmir 3,5 to hours 234 kilometers of the project was already opened. In this scope, the road between Osmangazi Bridge and Gebze Bursa, Balıkesir North West junction and Akhisar junction İzmir was put into service.

Istanbul Izmir Highway Route

The Route Opened Before The Feast

  • Bursa West Junction-Balıkesir North Junction: 97 kilometer highway and 3,4 kilometer connection road
  • Balıkesir West Junction-Akhisar Junction: 86 kilometer highway and 5,6 kilometer connecting road.

1 billion pounds, 2 billion pounds, 38 billion pounds from fuel oil, 3 million pounds, and 179 million pounds annually, 2019 million pounds from fuel oil. savings are envisaged. When the estimated traffic values ​​of 2,5 year are taken into consideration, it is estimated that 930 billion pounds from time, 3 billion 430 million pounds from fuel oil will total annual savings of 2023 billion 3 million pounds. Thanks to the motorway, 1 hour trip between Istanbul and Izmir will drop to 120 hours.

When the Istanbul İzmir Motorway is opened, how much will the total toll be?

Bursa West Junction Balıkesir North Junction (97 km.) And Balıkesir West Junction Akhisar Junction (86 km.) Will be taken into account fees will be taken.İstanbul Izmir Highway tolls to reach Izmir how many TL will pay? 1. class cars from Istanbul to Izmir including toll Osmangazi Bridge 256.30 TL pay. Here are the figures that other cars will pay:

Vehicle The Osmangazi Bridge Contact Yalova directly Bursa City Center Balikesir North Manisa Turgutlu Izmir exit
1. class      103,00 TL       4,40 TL    29,10 TL    43,20 TL      63,80 TL    12,80 TL
2. class      164,80 TL       6,90 TL    46,80 TL    69,06 TL    102,44 TL    20,00 TL
3. class      195,70 TL       8,20 TL    55,50 TL    82,10 TL    121,60 TL    23,80 TL
4. class      259,60 TL     10,90 TL    73,60 TL  108,90 TL    161,30 TL    31,50 TL
5. class      327,60 TL     13,80 TL    92,80 TL  137,40 TL    203,50 TL    39,90 TL
6. class        72,10 TL       3,10 TL    20,40 TL    30,20 TL      44,80 TL      8,80 TL

ISTANBUL IZMIR BRIDGE AND HIGHWAY TILLAGE (TOTAL)

Vehicle The Osmangazi Bridge Yalova-Altinova Bursa City Center Balikesir North Manisa Turgutlu Izmir exit
1. class 103,00 TL 107.40 TL 136.50 TL 179.70 TL 243.50 TL 256.30 TL
2. class 164.80 TL 171.70 TL 218.50 TL 287.56 TRY 390,00 TL 410,00 TL
3. class 195.70 TL 203.90 TL 259.40 TL 341.50 TL 463.10 TL 486.90 TL
4. class 259.60 TL 270.50 TL 344.10 TL 453,00 TL 614.30 TL 645.8 TRY
5. class 327.60 TL 341.40 TL 434.20 TL 571.60 TL 775.10 TL 815,00 TL
6. class 72.10 TL 75.20 TL 95.60 TL 125.80 TL 170.60 TL 179.40 TL

CONTRIBUTION OF THE PROJECT 3.5 BILLION TL

President Recep Tayyip Erdoğan today opened the Istanbul-Izmir highway. President Erdoğan, who opened the second stage of 192 Km, explained the cost of the Istanbul-Izmir highway in figures. Erdogan said that the cost reached $ 11 billion, said the highway was given to companies with the build-operate-transfer model for the 22 year 4 month period.

Emphasizing that the journey time between Istanbul and Izmir has been reduced to 192 hours with the completion of the 3,5 km road of the Istanbul-Izmir autobahn, Erdogan continues parallel to Izmir Ankara after Soma - Akhisar-Turgutlu and reaches his destination on the Izmir ring road. It reaches the İzmir Aydın and İzmir Çeşme motorway. Where, where… We did not cross the mountains easily. But we became Ferhat, Ferhat… We pierced the mountains and reached Şirin. Erdogan stated that his contribution to the state was 100 billion dollars by making the travel between Istanbul and Izmir fast and comfortable, as well as the road shortening by 3,5 kilometers.

Istanbul Izmir Highway Total Pass Fee

Passenger 1 considering only round-trip. 2 x 256,30 = for the class car 512,60 TL

Yeni Istanbul Izmir Highway Price
Yeni Istanbul Izmir Highway Price

Istanbul-Izmir Highway Project

1 units Suspended Bridge, 38 units Viaduct, 3 units Tunnel, 24 units Intersection, 179 units Bridge, 1005 units Grill, 17 units Motorway Service Plant, 4 units Maintenance Operation Plant, 2 units Tunnel Maintenance Operation Plant are available.

(İzmir-Turgutlu) Dy. Ayr. The connection road of 6,5 km between Kemalpaşa was on 20.10.2015, 40 km Highway between Altınova - Gemlik and 7,9 km. Connection Road on 21.04.2016, 12,6 km Gebze-Altınova (Including Osmangazi Bridge) Highway on 01.07.2016, 20 km Highway between Kemalpaşa Ayr.-İzmir on 08.03.2017, 25 km Highway between Gemlik-Bursa and 1,6 , 12.03.2018 Km. Connection Road was built on 49, 3,8 Km. Between Saruhanlı Junction - Kemalpaşa Junction. The Highway and 01.12.2018 Km Connection Road were put into operation on 146,6. In the whole of the project, 20 km of motorway and 166,5 km of connection roads were completed and XNUMX km was put into operation.

Balıkesir Section of İstanbul İzmir Motorway Project

In 2019, 29 Km Main Body between Balıkesir North Junction and Balıkesir West Junction 3,5 Km. Connection Road between Akhisar Junction and Saruhanlı Junction 24,5 Km. Main Body 8 Km Akhisar Connection road has been completed and 17 Mart has been put into operation in 2019.

Gebze-Orhangazi-İzmir (Including Izmit Bay Crossing and Connection Roads) Motorway Work; Bursa Interchange West Junction- (Balıkesir-Edremit) Junction between Bursa Intermediate West Junction and Balıkesir North Junction (Km: 104 + 535-201 + 380), (Balıkesir-Edremit) Junction of Balıkesir-Junction and Akhisar Junction within Balıkesir-Edremit Section (Km: 232 + 000: İ-315 + 114) sections of the General Directorate of Highways Law No. 6001 Services on the 15. of the Ministry of Transport and Infrastructure. These sections of the motorway will be opened to traffic at 04.08.2019: 23: 59 date and time.

Be the first to comment

Leave a response

Your email address will not be published.


*