Construction Center
213 Algeria

A Touta-Zeralda Railway

A Touta-Zeralda Railway: The project is located in the 25 km southwest of the capital Algeria. The design speed of the 23 km new double track railway, which will connect the capital city center to the Zeralda Suburb, is 140 km / h. Project route [more…]