Yeniorman Bridge Between Akyazı-Hendek is Being Renovated

Sakarya Metropolitan Municipality Mayor Yusuf Alemdar announced that renovation work has begun on the Yeniorman Bridge, which connects Akyazı and Hendek districts and is located on Dinsiz Creek. This important project, which was initiated because the current bridge is not resistant to natural disaster risks such as earthquakes, landslides, floods and inundations and has completed its service life, aims to make regional transportation safer and more comfortable.

A Strong and Modern Bridge is Being Built Instead of a Risky Bridge

Sakarya Metropolitan Municipality, which has taken decisive steps to bring the city's transportation infrastructure to the strongest level, has started the renovation work of the Yeniorman Bridge under the coordination of the Department of Technical Affairs. A new bridge that will meet the transportation demands of the local people and will be resistant to all kinds of negative possibilities is being built instead of the old bridge that does not meet today's standards and is inadequate for regional transportation. The teams have taken the first step with the bored pile works that form the basis of the project.

Good Luck Wish from President Alemdar

Hoping that the works will be beneficial for the people of the region, Metropolitan Municipality Mayor Yusuf Alemdar made a statement on the subject, saying, “We are renewing the bridge that has deformed and become dangerous over time over Dinsiz Creek between Akyazı and Hendek. Our teams have started their work. Hopefully, we will make transportation to the neighborhoods safer and more comfortable with the new bridge. We will continue to address our city’s transportation infrastructure as a whole. May it be beneficial.” Mayor Alemdar’s statement shows the sensitivity and determination of the Metropolitan Municipality in producing permanent solutions to transportation problems.

Pre-Demolition Preparations Completed, Bored Pile Works Started

The Metropolitan Municipality teams have completed the necessary preliminary preparations to completely demolish the deformed existing bridge. The demolition process of the bridge line, which is closed to transportation, will begin shortly. On the other hand, an important stage has been passed for the construction of the new bridge and bored pile work has begun. The new bridge, 47 meters long ve 16 meters wide In order to strengthen the foundation of the bridge, the preliminary preparations for bored piles were meticulously completed.

48 Bored Piles Will Be Driven Into The Foundation

In order to establish the new bridge on solid and safe ground, a total of 48 bored piles will be used. These bored piles of different diameters will be driven tens of meters deep into the ground with great care to form the foundation of the bridge. In this way, the local people will be able to travel over the stream safely and without any problems for many years. Two-span The new bridge, which will be built as a bridge, will maximize transportation safety and significantly raise the transportation standard in the region. This investment is expected to strengthen the transportation axis between Akyazı and Hendek and make positive contributions to the regional economy.

41 Kocaeli

Renewed Ormanya is Ready for 2025

Ormanya, which has been renewed with a focus on sustainability and comfort, is ready to welcome nature lovers with its modern infrastructure and natural beauties in the summer of 2025. Ormanya, which has been renewed with a focus on sustainability and comfort under the leadership of the Metropolitan Municipality, is ready to welcome nature lovers with its modern infrastructure and natural beauties in the summer of XNUMX. [more…]