
Sakarya Metropolitan Municipality, which has brought new streets and arteries to the city and given the existing group roads a brand new look with infrastructure, pavement, hot asphalt and road marking works, has won the satisfaction of the citizens with the asphalt works it carried out in 2024.
222 thousand tons of hot asphalt in a year
Continuing urban design and street renewal works throughout the city in the past year, the Metropolitan Municipality carried out 66 kilometers of hot asphalt work and brought a total of 222 thousand tons of hot asphalt to the roads of Sakarya.
Aesthetic transportation corridor
The Metropolitan Municipality, which renewed the transportation networks all around the city in 2024 and gave it a modern and aesthetic appearance, created aesthetic transportation corridors with the "Prestige Street Application" works of the Road Maintenance and Infrastructure Coordination Department (YOLBAK).
From infrastructure to superstructure, it is new
With the feverish work of the teams, Ahmet Yesevi Street, one of the important routes in the city center where thousands of vehicles pass every day, Ada Street, the busiest street in Akyazı, Kırcaali Street, which provides transportation between Serdivan Campus and D-100 Highway, and Yazlık 2nd Street, which is the point with the heaviest traffic load in Serdivan, were completely renewed.
The center of social life: Serdivan 1st Street
In addition, a new route shouldering the transportation burden of the city in the Serdivan region was put into the service of Sakarya residents. The 1st Street opened in the shopping malls region became an attractive area for social life in the region with its landscaping, walking areas and park areas.
Two important routes, Arifiye Mollaköy and Erenler Küpçüler Street, were renewed from their infrastructure to their superstructure and put into the service of citizens.
The city's roads are safe and comfortable
In road renewal works, the Metropolitan Municipality first makes the infrastructure of the routes problem-free. The routes with renewed infrastructures are processed like a painting with hot asphalt, pavement and road lines.
44 thousand square meters of pavement manufacturing
Working 16/7 to build a stronger transportation network in the city center and 24 districts, the Metropolitan Municipality completed a total of 2024 square meters of pavement construction and 44 kilometers of hot and cold road marking work in 822, making the city's roads comfortable and safe.
YOLBAK teams on the field
In addition to all these, the Metropolitan Road Maintenance and Infrastructure Coordination Department installed a total of 2024 meters of steel barriers around the dangerous transportation lines in urban and rural areas in 3, 412 meters of V channels to increase road safety in rural areas, and more than 19 direction signs to ensure easy and fast traffic.