japonya, With the new extension of the Hokuriku Shinkansen, has once again achieved a groundbreaking success in transportation infrastructure. £27,5 billion This project, which was completed at a cost of (5,3 trillion JPY), From Tokyo to Fukui Prefecture It offers transformative benefits for both locals and tourists by significantly reducing travel times.
Advantages of the New High Speed Train Line
Faster and More Comfortable Travel
- Tokyo–Fukui: Travel time is three and a half hours less than three hours downloaded.
- Osaka, Kyoto and Nagoya – Fukui and Kanazawa: Travel times Shortened by 15 to 20 minutes.
These improvements make both business and tourist travel more efficient.
Increased Accessibility
Fukui Prefecture is known for its cultural heritage and natural beauty. The new high-speed rail line has made the area more accessible to other major cities in Japan:
- Echizen Pottery Workshops: One of Japan's famous centers of pottery art.
- Eiheiji Temple: One of the important centers of Zen Buddhism.
- Maruoka Castle: One of the oldest fortifications in Japan.
Economic and Touristic Benefits
Tourism and Economic Revitalization
The new train line promises to make a significant contribution to the regional economy by increasing tourism. Daily passenger numbers are expected to reach 6.300, which is significantly higher than the previous average of 5.300 passengers.
- Regional Impact: More tourists means investment in local businesses and cultural events.
- Direct Flights: Between Tokyo and Tsuruga 14 direct flights daily is organized, which increases the ease of transportation.
Ticket prices
- Unreserved Seat: ¥15.830 (approximately £82.36).
- Reserved Seat: ¥16.360 (approximately £85.12).
- First class: ¥24.210 (approximately £125.99).
This pricing targets a wider range of passengers by appealing to different budgets.
Technical and Financial Challenges of the Project
Cost Increase
Initially £10,3 billion The projected project cost (JPY 2,1 trillion) has more than doubled due to unforeseen challenges, but this has not shaken the belief in long-term benefits.
- Total Cost: £27,5 billion (JPY5,3 trillion).
- Investment Rationale: In the long term, it will deliver economic benefits through increased tourism, trade and connectivity.
Past and Future Stages
- This completed phase of the project represents part of a plan to extend the Hokuriku Shinkansen line to Osaka.
- With the completion of the extension, Japan's transportation network will further improve regional connectivity.
Japan's Leadership in Transportation Innovation
World Class Infrastructure
japonya, state-of-the-art infrastructure and high-speed train systems The new extension of the Hokuriku Shinkansen sets an example for high-speed rail projects not only in Japan but around the world.
Efficiency and Comfort
- High-speed trains have become a preferred method of transportation for both business travel and tourism.
- Trains moving at speeds of hundreds of kilometers per hour, also stands out as a pioneer of environmentally friendly transportation.
A New Era in Japan's Transportation
The expansion of the Hokuriku Shinkansen will increase Japan's economic and tourist potential, while also improving the transportation system efficiency, accessibility and connectivity The benefits it offers to both locals and tourists make this project a significant milestone in Japan's infrastructure history.
With the completion of the extension, Japan maintain its leadership in the transportation and tourism sector The Hokuriku Shinkansen will continue to play an important role in the social and economic development of the region.