Mersin Metropolitan 4th Sewer Junction Opened

Mersin Buyuksehir Sewer Junction Acti
Mersin Metropolitan 4th Sewer Junction Opened

Mersin Metropolitan Municipality Road Construction, Maintenance and Repair Department teams completed the 3th canalized junction within the framework of their work on the 4rd Ring Road. After the intersection work held at the intersection of 13. Street and 38. Street, the road was opened to traffic.

The road arrangement, renovation and improvement works carried out gradually on the 3rd Ring Road by the teams of the Road Construction Maintenance and Repair Department continue. Within the scope of the works carried out gradually according to the needs, the roundabout connecting the 3rd Ring Road, one of the busy intersections, with 38th Street was turned into a canalized intersection with the arrangement made.

Thanks to the intersection work that gives direction from 3 different lanes in straight direction, right and left turns; The waiting time of vehicles at traffic lights and the extra traffic density due to the increasing population after the earthquake will also decrease. In order to ensure a comfortable and safe ride for cyclists, 3 tons of hot asphalt was poured, approximately 2 meters of curb work and 1000 square meters of pavement were produced at the intersection where the bicycle path was built.