Phaselis Tunnel on the Mediterranean Coastal Road was put into service

Phaselis Tunnel on the Mediterranean Coastal Road Has Been Put into Service
Phaselis Tunnel on the Mediterranean Coastal Road was put into service

Phaselis Tunnel was opened with a ceremony attended by President Recep Tayyip Erdoğan via video conference. Minister of Transport and Infrastructure Karaismailoğlu emphasized that the Phaselis Tunnel consists of a 305-meter-long 2×2 lane double tube, and said that the road route will be shortened by 2 kilometers and the travel time will be shortened by 10 minutes.

Phaselis Tunnel was put into service in Antalya, the heart of tourism. President Recep Tayyip Erdoğan, who attended the opening via video conference, said, “This tunnel on the Mediterranean coastal road will provide great convenience to the western districts of Antalya. Like this; Our districts such as Demre, Finike, Kumluca, Kemer, Kaş and Kalkan will be in contact with Antalya city center faster and safer. Likewise, products originating from this region, which is one of the most important vegetable growing centers of our country, will easily reach our other cities. This tunnel only saves time and fuel for 31 million lira per year to our country. kazanIt will reduce carbon emissions by 1,8 thousand tons," he said.

Minister of Transport and Infrastructure Adil Karaismailoğlu stated that with the works carried out since 2002 under the leadership of President Recep Tayyip Erdoğan, a new era has been reached in the reconstruction of Antalya as well as in the rest of the country, and said, “The pearl of the Mediterranean, Antalya, took the divided road length of 197 kilometers and took it from 677 kilometers. kilometers up. We have built 21 tunnels with a total length of 473 thousand 20 meters and 17 bridges with a total length of 753 thousand 154 meters. We have made a great contribution to the Turkish economy with the contract of leasing the operating rights of Antalya Airport. To the public with the extra-budgetary financing method; 1 million Euros of investment and 765 billion 8 million Euros of rental cost without leaving a single penny from the state's coffers. kazanWe're going out," he said.

Noting that the divided road network will be increased to 2053 thousand 38 kilometers and the highway network to 60 thousand 8 kilometers by 325, in accordance with the environmentalist scenario determined in the Transport and Logistics Master Plan, Karaismailoğlu said that they aim for Turkey to be a pioneer among the top 10 countries in the world in development.

GIANT WORKS TO OUR NATION IN THE LAST MONTH KAZANDIRK

Pointing out that the Phaselis Tunnel consists of a 305-meter-long 2×2 lane double tube, Karaismailoğlu stated that they have also completed the connection roads together with the tunnel. Karaismailoğlu emphasized that once the tunnel is put into service, the road route will be shortened by 2 kilometers and the travel time will be shortened by 10 minutes. Karaismailoğlu, Minister of Transport, said, “Every road we put into service, just like a river, passes through, and adds life to the production, employment, trade, tourism and cultural life of every place” and continued his speech as follows:

“We will continue to work day and night for our country and nation to take the place they deserve in the world on the 100th anniversary of our Republic. The best example of this is the giant works we have done in 20 years under your leadership. Just in the last month, his giant works have been presented to our nation. kazanwe nagged. Works that will produce successful and productive results such as the 1915 Çanakkale Bridge, Tokat Airport, Malatya Ring Road will be beneficial to our nation. kazanwe nagged. With each of our projects, we are laying another stone on the path on which our nation will walk towards the future. We will continue to connect the world to Turkey by making more works with the AK Party cadres who have come together with the determination to work.”

Similar Ads

Be the first to comment

Comments