Traffic Regulation on Manas Boulevard

Traffic Regulation on Manas Boulevard
Traffic Regulation on Manas Boulevard

As part of the cleaning, maintenance and repair works to be carried out at the İzmir Main Belt Canal collector, as of Thursday, January 13, the traffic patterns of 3 different points on Manas Boulevard will be changed. It is planned that the traffic pattern will return to normal within 3 months.

Cleaning, maintenance and repair works are starting in İzmir Main Belt Canal by İzmir Metropolitan Municipality İZSU General Directorate. Starting from the junction of Fatih Caddesi and 2821st, Fatih Caddesi, Manas Boulevard, Symrna Square, Bayraklı Cleaning works will be carried out between the Wastewater Pumping Station. Within the scope of the works, as of Thursday, January 13, changes will be made in the traffic pattern.

The direction from Manas Boulevard to Konak at 1586/8 street level is for 60 days, at the intersection of Haydar Aliyev Street of Manas Boulevard one lane to Konak is for 30 days, and one lane of Fatih Caddesi to Şehitler Caddesi is It will be closed to vehicle traffic for 10 days.

It is planned that the cleaning, maintenance and repair works will be completed within 3 months and the traffic order will return to normal.

Traffic Arrangement in Manas Boulevard

Be the first to comment

Leave a response

Your email address will not be published.


*