Metro Services in Istanbul Extended Until 02.00:XNUMX At Night Today

Metro Services in Istanbul Extended Until 02.00:XNUMX At Night Today
Metro Services in Istanbul Extended Until 02.00:XNUMX At Night Today

Continuing its inspections all day long regarding the snowfall that affected Istanbul, IMM carried out a coordinated work with the Governor's Office and district municipalities. Metro services were extended until 02.00:XNUMX last night. As of this morning, the latest situation in public transportation is as follows:

METRO ISTANBUL

As of this morning, the services are running normally on all lines on the rail system lines, which were extended until 02.00:XNUMX last night and continuous precautionary driving and cleaning works were carried out.

Just; T1 Kabataş- On the Bagcilar Tram Line, the flights, which were routinely at 5-6 minutes intervals due to the breakdown last night, are now made at 10-minute intervals.

The flights on the metro lines have been extended until 02.00:XNUMX at night today.

CITY LINES

There is no voyage disruption on the City Lines Ferries as of now, and the voyages are carried out in their normal course.

IETT

As of now, the rate of travel in buses affiliated to IETT is 65%.

Number of Expeditions Planned Today: 43 bin 675

Number of Expeditions Planned as of Now: 14 bin 979

Number of Expeditions Performed: 9 bin 614

Number of Lost Campaigns: 5 bin 509

Additional Expedition: 144

Expedition Realization Rate: 65%

Total Planned Number of Vehicles: 5 bin 240

Transitions between Mecidiyeköy, Taksim and Çırpıcı and to the Anatolian region were affected; Flights were also affected on the Anatolian side in Maltepe and Ataşehir, and on the KM48 and 8A lines due to weather conditions.

Be the first to comment

Leave a response

Your email address will not be published.


*