Şaşmaz Sanayi Boulevard Bridge Closed to Traffic Due to Joint Renovation Work

Sasmaz Sanayi Boulevard Bridge was closed to traffic due to joint renovation work
Sasmaz Sanayi Boulevard Bridge was closed to traffic due to joint renovation work

Ankara Metropolitan Municipality continues its construction, maintenance and repair works on the old roads in the center and districts without slowing down. The Department of Urban Aesthetics will close the road to traffic for 7 days as of 2021 on Saturday, August 00.01, 9, as part of the expansion joint renovation work on the Şaşmaz Sanayi Boulevard Bridge (in the direction of the old bridge-Ümitköy). Within the scope of the works, the traffic will be controlled from the opposite lane.

Ankara Metropolitan Municipality, prioritizing life safety, continues its road construction, maintenance and repair works in the center and districts without interruption.

The Department of Urban Aesthetics, which continues its joint renewal works throughout the city, will start the expansion joint renewal work on the Şaşmaz Sanayi Boulevard Bridge (in the direction of the old bridge-Ümitköy) as of August 7, 2021.

ON THE BRIDGE TO BE CLOSED TO TRAFFIC FOR 9 DAYS, TRAFFIC WILL BE PROVIDED FROM THE AGAINST LANE

The road will be closed to traffic for 7 days due to the expansion joint renovation works that will start on Saturday, August 00.01th at 9:XNUMX on the Şaşmaz Sanayi Boulevard Bridge.

Ankara Metropolitan Municipality, which informs the citizens by announcing the work to be done on its social media accounts, will provide the crossings at the point to be closed to traffic in a controlled manner from the opposite lane.

Be the first to comment

Leave a response

Your email address will not be published.


*