Ordu Durgun Water Sports Center Works Have Ended

Ordu stagnant water sports center studies have come to an end
Ordu stagnant water sports center studies have come to an end

Ordu Metropolitan Municipality has come to an end with the works of the Still Water Sports Center, which will make Ordu a center where competitions can be held in national and international sports such as canoeing and sailing. The center, where the infrastructure and superstructure works have been completed, will be opened to the service of water sports after the landscaping and track installation works.

Ordu Metropolitan Municipality Mayor Dr. The works initiated by Mehmet Hilmi Güler in many areas from transportation to infrastructure, from tourism to agriculture in order to make Ordu a livable city for 3 months, not 12 months, continue uninterruptedly.

PRESIDENT GULER INTEGRATED THE CITY WITH THE SEA

The works carried out by President Güler in order to benefit more from the sea and to integrate the city with the sea are appreciated by the citizens. In this context, President Güler, who brought the Martyr Temel Boxwood Ship together with the sea, implemented wave surfing on the shores of Ordu, and decorated the Black Sea with sails and canoes, became a pioneer in water sports in Ordu with the Stagnant Water Sports Center built next to Ordu-Giresun Airport in the Gülyalı district. will make it a province.

WORKS ON THE WATER SPORTS CENTER HAVE ENDED

The works of the Stationary Water Sports Center, which will provide great convenience for the athletes, trainers and sports fans who will come to Ordu due to its location next to the airport, have come to an end. While infrastructure and superstructure works are completed in the center, where many departments work together, landscaping and track installation works continue. It is aimed that the work carried out by the teams from four branches will be completed in a short time and the center will be operational.

EVERYTHING IS CONSIDERED IN DURGUN WATER SPORTS CENTER

In Durgun Water Sports Center, which will host national and international races, a tribune for 400 people in total, 1 protocol box, 1 race finish observation tower with photo-finish camera, 6 portable floating docks, 100-vehicle spectator parking lot, 20-car sports trailer parking lot area, 300 meters of boathouse, 400 meters of sales and promotion area, 1.142 meters of vehicle and bicycle path, a crossing bridge over the creek exit and accommodation area for referees and athletes.

Be the first to comment

Leave a response

Your email address will not be published.


*