Ankara YHT Station, TCDD's First BOT Project

Ankara Yht Gari, the first yid project of tcdd
Ankara Yht Gari, the first yid project of tcdd

Ankara High Speed ​​​​Train Station, which has an architectural project that will enrich the architectural richness of the capital, was built for the first time by the Republic of Turkey State Railways with the Build-Operate-Transfer model.

TCDD's First Build-Operate-Transfer Project

Ankara High Speed ​​​​Train Station, which has an architectural project that will enrich the architectural richness of the capital, was built for the first time by the Republic of Turkey State Railways with the Build-Operate-Transfer model.

The new station building was built without touching the existing Ankara Station, which has an important place in our history, in our songs and poems, and in our memories.

Author prestige of Turkey and Ankara

Designed to represent speed and dynamism in accordance with the new vision of TCDD, the work reflects today's architectural conception.

Ankara YHT Station, which will take its place among the prestigious works of Turkey and Başkent with its architecture and social facilities, was built to be connected to Başkentray, Ankaray and Keçiören metros.

50 will serve a thousand passengers

Ankara YHT Station will be able to serve up to 50 thousand passengers per day.

The 12 m3 6 m194.460 2 units and 8 pieces of railway tracks are located at the same time.

The heart of the capital will beat at Ankara YHT Station

In Ankara YHT Station, where indoor and outdoor parking services for a total of 1.910 vehicles will be provided, as well as units for transportation services; There are social and cultural facilities such as commercial areas, cafe-restaurant, business offices and multi-purpose halls, prayer room, first aid and security units and a hotel.

While all our passengers have comfortable travel opportunities, the social and cultural life of the city meets at Ankara YHT Station.

The YHT Station, which is planned to meet all the needs of the disabled by using the latest technology, becomes the center of attraction of the capital.

TCDD will operate trains

Ankara YHT Station, which was built in 2 years and will be operated by Ankara Train Station (ATG) for 19 years and 7 months, will be transferred to TCDD at the end of this period. The train management of the new station will be carried out by TCDD.

Be the first to comment

Leave a response

Your email address will not be published.


*