Another Node Is Solved In Bursa Recruits

Another Node Is Solved In Bursa Recruits
Another Node Is Solved In Bursa Recruits

The works on the bridges and connection roads that will allow the vehicles coming from İzmir road and Mudanya direction to go to Hayran Street, Bursa Ali Osman Sönmez Hospital and Hüdavendigar Neighborhood without using the Acemler Junction, which Bursa Metropolitan Municipality has designed to relieve the burden of the Acemler Intersection, is about to be completed. .

In order to eliminate the transportation problem in Bursa, the Metropolitan Municipality, which continues its works such as road widening and new roads, promoting public transportation, and optimizing the rail system signalization, has brought another project to Bursa that will bring breath to Acemler, which is one of the nodal points of the city traffic. kazanyelling. The Metropolitan Municipality, which previously added two lanes to the return branch from İzmir Road to the Ring Road in Acemler, where the daily average density is around 180 thousand vehicles, is even more dense than the 15 July Martyrs Bridge, thus increasing the passing capacity of 1000 vehicles per hour on the return branch. . There are bridges and connection roads designed at Mudanya Junction in order to reduce the load created by vehicles coming from Izmir road and Mudanya direction at Acemler Junction, and which will allow vehicles coming from both directions to go to Hayran Caddesi, Bursa Ali Osman Sönmez Hospital and Hüdavendigar District without coming to Acemler. The work has now come to an end.

The burden of the novices will decrease

All vehicles coming from Izmir and Mudanya direction to Dikkaldırım and Hüdavendigar districts had to use Acemler or Orhaneli intersections since there was no other alternative. Within the scope of the project prepared to eliminate this intensity, 4500 square meters of special earth reinforcement was made for İzmir road connection, and a viaduct steel bridge was fabricated for the passage over the Light Rail System depot area. The road width was designed as a round trip with a total length of 2500 meters and a variable platform of 8,50 and 14 meters. Landscaping, pedestrian and bicycle paths, lighting works and related infrastructure works were carried out. In terms of pedestrian and vehicle safety, 280 tons of pedestrian and auto guardrails were manufactured on the route. Thanks to the project, where the works have now reached the final stage, the vehicles coming from İzmir and Mudanya direction will now be able to easily go to Hayran Caddesi, Bursa Ali Osman Sönmez Hospital and Hüdavendigar Neighborhood without coming to the Acemler Junction.

Parking in front of the hospital

The Metropolitan Municipality, which is working feverishly in the region in order to eliminate the traffic density in Acemler, on the other hand, parking lot for buses and private vehicles in the area opposite Ali Osman Sönmez Hospital. kazanyelling. The works for the city bus and car parking area, which was established on an area of ​​​​approximately 15 thousand 450 square meters on the road opposite Ali Osman Sönmez Hospital and on Hayran Street, are continuing rapidly. There will be 15 buses and 1 taxi platform and an open parking lot for 272 vehicles in the area. The open car park will be used both as a regional car park and will meet the parking needs of the relatives of the patients who will come after the opening of Ali Osman Sönmez Hospital. The existing West Garage and the bus area next to the Acemler station will be moved to the new location.

Similar Ads

Be the first to comment

Comments