
YT Line, between Muratbağı-Palu Stations, Rehabilitation of Tunnel No. 3 (km: 83 + 970-84 + 276) Tender Result
TC State Railways Enterprise TCDD 5th Region Purchasing Directorate (TCDD) YT Line, which is 2020/234038 KIK and has an approximate cost of 3.374.332,47 TL, is located between Muratbağı-Palu Stations, Number 3 Tunnel (km: 83 + 970-84 + 276) 93 firms submitted bids for the reclamation works tender and MİRZE MEHMET POLAT BEYMEN MÜH and MÜŞ won the tender with a bid of 2.178.378,75. 46 firms participating in the tender made a bid below the limit value.
The tender covers the rehabilitation works of Tunnel No.3 (km: 83 + 970-84 + 276), which is located between the YT Line, Muratbağı-Palu Stations. The duration of the work is 200 (two hundred) calendar days from the place delivery.