Darıca Fevzi Çakmak Mahallesi, Cevahir Street, will be closed to vehicle traffic within the scope of the construction works of the Infrastructure Investments Darıca Gebze Metro line.
ALTERNATIVE ROUTE WILL BE USED
Construction of the Darıca - Gebze metro line of the General Directorate of Infrastructure Investments continues. As of Wednesday, May 20, Darıca Fevzi Çakmak District will work on Cevahir Street. A warning for the use of temporary routes was made by Kocaeli Metropolitan Municipality for the street that will be closed to vehicle traffic during the working period. During the study, drivers will use alternative routes.
Be the first to comment