Samsun Sivas Railway Line New Development!

new development on samsun sivas railway line
new development on samsun sivas railway line

Samsun Metropolitan Municipality to TCDD warning: 'City traffic is locked' Samsun Metropolitan Municipality, Samsun - Sivas Railway line Ilkadim district Ataturk Bulvari Junction Crossing Kılıçdede Junction Crossing will lead to major traffic in the city traffic, finding an emergency solution to find TCDD 4. He sent a letter to the Regional Directorate.

378 kilometer Samsun-Sivas (Thick) Railway line 30 was completed in September 1931. 29 September 2015 on the date of renewal due to closed transport and the intervening 4 year, despite the two-year delay in Samsun-Sivas Railway, after a delay of two weeks will begin test drives. There was a significant improvement before the start of the test drives. Samsun Metropolitan Municipality, Samsun - Sivas Railway line İlkadım district Atatürk Boulevard Kılıçdede Junction Crossing the railway crossing will lead to major blockages in urban traffic, TCDD 4. He sent a letter to the Regional Directorate.

IMPOSSIBLE FOR THE CITY

Samsun Metropolitan Municipality, TCDD 4. Regional Directorate 2 December 2019 dated article, the Samsun-Sivas railway opening to traffic with the crossing of Kılıçdede said the urban traffic will be jammed. The opening of the gate, the most optimistic road traffic 2 minutes, in the normal scenario 3, -4 minutes, the number of trains and wagons to increase if the number of 6-8 minutes will be cut, said that it is impossible for the city.

LOCAL TRAFFIC LOCKS

Samsun Metropolitan Municipality Secretary General Ilhan Bayram in the letter sent by the signature, "In case of train crossings Kılıçdede Junction, highway traffic will have to wait between 2 and 4 minutes" by emphasizing the "In this case, Ataturk Boulevard backward Junction Junction, Muhittin Ozkefeli Boulevard Istiklal Street, ' kilitlen will be locked along the street, especially during peak hours in the city center is expected to cause a lot of traffic ”said.

WILL CREATE VERY BIG PROBLEMS

The article also stated that “If there are trains passing through each other, it would create a bigger problem in locking the wheeled vehicle traffic and there would be similar blockages in certain time zones during the weekend when shopping centers and small industrial sites are busy. demiryolu It is possible that the railway level and train crossings will become impossible if the traffic load is gradually increasing, and the train traffic will increase with the introduction of the line going to the logistics center. ”

ALT OR UPPER PASS

As a permanent solution of Samsun Metropolitan Municipality, ı To ensure uninterrupted crossing with multi-level junction (underpass or overpass), to implement a multi-level (under or overpass) system to ensure uninterrupted crossing that will not prevent traffic circulation of shopping centers and small industrial sites s stresses the necessity.

EXACT SOLUTION WANTED

Samsun Metropolitan Municipality in the article, the final solution until the time of entry into the solution that will affect the urban transport at least, or at times of heavy traffic, at least 2 minutes of road traffic to interrupt the train flights wanted to be made.

samsunhabertv

Railway News Search

Be the first to comment

Comments