Samsun Army High Speed ​​Railway Line Soldiers Delivered to the Project Tender

project tender samsun army fast train line armies delighted
project tender samsun army fast train line armies delighted

Samsun Army High Speed ​​Line Soldiers Delivered to the Project Tender; Samsun-Ordu High Speed ​​Train Line, which was awarded the project tender last week, delighted the Ordulular. OTSO President Servet Şahin said that they had been happy for years. OTSO Parliament Speaker Levent Yildirim said, “The railway will make a significant contribution to the tourism and industry of the Army.”

Samsun-Ordu Railway (Infrastructure, Superstructure, Electromechanical) Survey, Project, Engineering and Consultancy Services For the consultancy work of the job, candidates with sufficient experience were invited to submit a prequalification application. Among the ones whose qualification is determined as a result of the prequalification evaluation, they will be shortlisted according to the criteria specified in the prequalification specification and will be invited to submit tenders with the participation of the tenderers with the participation of the tenderers in accordance with the provisions of the 4734 Law No. 5. Tender 25 On December 2019, TCDD General Directorate Purchasing and Stock Control Department Meeting Room (3.kat room 4052) will be held at 10.00.

FEASIBILITY STUDY WILL BE HELD

TCDD, Samsun-Çarşamba-Ünye-Fatsa-Ordu railway lines planned to be built as a double-line and EST'li alternative operating scenarios (operating speed, passenger, freight, mixed traffic, etc.) to evaluate the feasibility study envisages. With this technical specification, in addition to the existing transportation system on the Samsun-Çarşamba-Ünye-Fatsa-Ordu route, in addition to the existing transportation system, the assessment of the economic and financial (Financial) aspects of the construction of a Railway; It is aimed to determine the technical details of the Feasibility Study, which will include Economic Analysis to determine whether it is economically feasible or Financial Analysis to determine whether it is feasible.

ŞAHİN: BOTH TOURISM AND TRADE

The proclamation of the tender was also a great joy for the Ordulular. Servet Şahin, President of Ordu Chamber of Commerce and Industry, stated that another dream of the army started to be realized and said, “First of all, we would like to thank all those who contributed to this issue, especially our President Recep Tayyip Erdoğan. That was what it was supposed to be. Samsun-Sarp Railway had to continue through Ordu and Giresun. We anticipate that the tourism potential and trade life of our province will be revived thanks to this railway. People departing from Istanbul or another province may go to Beijing from here. We see how attractive the Kars railway is. He goes back to Kars from Ankara. Why should there not be such a mobility in our province? Konu (Army Event)

Be the first to comment

Leave a response

Your email address will not be published.


*