Çekmeköy Sultanbeyli Metro Construction Has Started Again

mamoğlu Production Has Restarted Duran Metro Line for Years
mamoğlu Production Has Restarted Duran Metro Line for Years

Construction of Çekmeköy Sultanbeyli Subway has begun again; İBB President Ekrem İmamoğlu has restarted Çekmeköy-Sancaktepe-Sultanbeyli Metro Line, which has been constructed for 2 years. Emamoğu emphasized that every service to the city is owned by the public and said: “Istanbul's power and potential is different. The world stops, Istanbul does not. Istanbul is the center of the world. This is not about today; thousands of years ago, so will today and so will tomorrow. We must act accordingly and support each other accordingly. So we have to move all the way. The hearts of our 16 million people must strike for Istanbul. ”

The construction works of Çekmeköy-Sancaktepe-Sultanbeyli Metro Line, which has been stopped for 2 for years and only 6 of its physical production to date, have been restarted. The TBM (Tunnel Boring Machine) machine, which is described as eral underground monster,, was lowered to the construction site of Sancaktepe Station with a ceremony attended by Istanbul Metropolitan Municipality Mayor Ekrem İmamoğlu. The ceremony, CHP Istanbul deputy Gökhan Zeybek and Sancaktepe Mayor Şeyma Döğücü also attended. Before the ceremony, the trio made inspections in the construction site. Imamoglu, in his speech at the ceremony thanked everyone who contributed to the construction of the line.

“ISTANBUL IS NOT A SINGLE ISSUE”

Stating that public transportation is one of the most important subjects of Istanbul, İmamoğlu said, “Our city has many subjects. I wish we could make the 'most important' definition of a single issue. But not like that. There is another point that stands at a different point, which we all have to deal with, such as earthquakes, which we all regard as vital issues. Or socially, we should never forget, the most important issues in our country and our city, the refugee issue, there is the issue of refugees. 'There is only one important issue, don't say focus on it'. Emamoğlu emphasized that they produce various solutions in public transportation and said, “Metro is our first line business. The issue of raising the metro to the highest level in Istanbul is a national issue. We need to bring hundreds of kilometers of metro into this city. On the first day of its commencement, from Mr. Sözen, I would like to thank every metropolitan mayor who contributed individually. We have a claim: 'To do more'. The claim that comes after us must be able to do more. We said to him, 'Everything will be very beautiful'. His philosophy is very clear: When you wake up every morning, say, 'Everything will be very good'. Which, take a step forward in doing better. 'When you say everything has been very good, life is over,' he said.

“NOW DAY, SERVICE DAY”

Imamoglu said that when they took office, the total 8 metro line was stopped and that they had restarted a second line after the Ümraniye-Göztepe Metro Line. Imamoglu said, “Today, we are making the beginning of another line. This line is an important line. I mentioned the importance of this line in our speeches in the region. No more days, service days. My friends put forward an intensive study on the issue of financing related to the implementation of this line. 2 has started the process with the participation of our brave companies who are the manufacturers of this line together with the financial resources that are related to the mobilization of this construction site which has been standing for years. I hope this process will end quickly. The economy does not experience an easy process both in our country and in the world. Financing is now much worse than 2 years ago. It is also important that the Deutsche Bank, Germany, trusts and contributes to this process. Thank you for the cooperation leri.

“THE POWER AND POTENTIAL OF ISTANBUL IS OTHER”

Am Istanbul's power and potential is different, İm said İmamoğlu, “The world stops and Istanbul does not. Istanbul is the center of the world. This is not about today; thousands of years ago, so will today and so will tomorrow. We must act accordingly and support each other accordingly.

So we have to move all the way. The heart of our 16 million people must strike for Istanbul. We need to make the right decisions. We need to cooperate in making the right decisions. This work; central government, Istanbul Municipality, district municipality does not have such a thing. None of this is in the way. Everyone needs to act with a character who helps in front of such works and manages to become arm in arm. We're ready for that. Whoever pulls his arm, we will struggle to catch his arm. In other words, we regard ourselves as the most courageous institution in terms of cooperation. Regardless of which person, institution and political authority we are looking at it. In this respect, this is the equivalent of tolerance, tolerance, sense of unification and business accomplishment. At this point, the signatures have been signed and we celebrate today with the cooperation of IMM, contractors, Ankara and financial institutions. Everybody will applaud, it's that simple. ”

“THE OWNER IS THE PUBLIC“

Emamoğlu emphasized that the owner of a service was not the mayor of that period or the political party that was in power at the time. state, public, nation. In other words, you are the mediator who succeeded that process on that day. I'm the agent. Today I'm the broker, tomorrow someone else. Let us praise our achievements, but never say 'We are the owner'. Not out of line. Therefore, each project does not belong to a party nor belongs to the person in charge. We, as individuals who have an obligation to manage that process well, have fulfilled our duty. And we will bring our people together with this modern means of transportation. No one in our mouths will hear: 'The project of our party, my project, I did it.' No such thing. 'We have done, nation we have done. We will accelerate the bus renewal process of the BRT, not only the subway, but also our public transportation errors supporting the subway. In particular, we will shorten the IETT lines, not long, make them express and support other public transportation lines. At the same time, we will focus on sea transport and make other points of public transportation more effective. In other words, we will create a fully integrated system in Istanbul. Public transportation is a matter of tension, you have no chance to say, 'We have solved it completely'; but we want to have an Istanbul that is as contemporary as possible, where the society is not disturbed, makes daily trips with pleasure and spends most of his life in his work, strength and social life, not in public transportation. ” Imamoglu, who shares technical information about the line, pushed the button with the accompanying delegation after his speech and the TBM machine was downloaded to the construction site with a ceremony.

64 THOUSAND 800 PASSENGERS WILL BE MOVED AT ONE DIRECTION

The 8 station, which is expected to ease road traffic on the Anatolian side of the city, is expected to reduce vehicle crossings between the two sides. The length of taste, 10,9 kilometers, journey time will be 16 minutes. The line will be transported 64 thousand 800 passengers in one direction per hour. Line; Çekmeköy, Sancaktepe and Sultanbeyli districts will pass. When the new line, which is the continuation of the Üsküdar-Ümraniye-Çekmeköy Metro Line, was put into service, the Marmaray and Metrobus lines, ready-made Marmaray and Metrobüs lines, the implementation projects of which were completed, Sultanbeyli-Kurtköy High Speed ​​Train and Yenidoğan-İmes-Soyak Yenişehir Metro lines, and the Hospital-Taşdelen-Yenidoğan Metro Line under construction. Will be integrated with Dudullu-Bostancı Metro Line and Ümraniye-Ataşehir-Göztepe Metro Line.

DOORS TO PREVENT FALLING ON RAILS

May 2017 construction started in 29 December 2017'de stopped by the IMM. Construction restarted at March 2018; however, due to lack of progress payments, the construction site was silenced at October 2018. The line, which was re-manufactured by obtaining loans from Deutsche Bank with the agreement signed in November 2019, is planned to be put into service in the last quarter of 2022. While the main line tunnels of the subway system are drilled by TBM, the 6 station platform will be built with NATM tunnel method and ticket halls will be built with open-close system. The platform and ticket halls of the 2 station will be realized with the complete open-close method. The line, which will be built with the latest technology, will provide Metro Fully Automatic Driverless Metro ”service. Boy Full Length Platform Separator Doors leyen will be used in the stations to prevent falling onto rails. At Samandıra Station, drivers can park their vehicles and continue their journeys by metro. For this purpose, 336 vehicle capacity fully automatic mechanical parking service will be provided.

Railway News Search

Be the first to comment

Comments