Vehicle Overpass Instead of Level Crossing Tender Result

basmane opium line at the level crossing in the middle of the crossing instead of doing alasehir heat
basmane opium line at the level crossing in the middle of the crossing instead of doing alasehir heat

Basmane Afyon Line Km: 171 + 165'de Level Crossing Vehicle Overpass Construction (Alaşehir) Work

Turkish State Railways. 3 / 2019 of the Regional Purchasing and Stock Control Service Directorate (TCDD) with the limit value 515873 TL and the approximate cost of 6.164.910,02 TL is Basmane Afyon Line Km: 9.014.220,20 + 171. 165 TL bid with the tender and according to the final result ZİRVEYOL İNŞAAT MÜH. TAAH. HAR MAD. TRZ. NAK. LTD. Sti. + KIZILDAĞLAR CONSTRUCTION PET. TURZ. MAD. EML. FOOD SAN. TIC. LTD. Sti. joint venture. The 36 company, which participated in the tender, submitted bids below the limit value.

Tender, 25000 m3 Reinforced Earth Wall Filler, 3900 m2 Earth Wall, 580 mt. 120 cm Pile Casting Pile, 180 Tons Ribbed Reinforcing Steel and Workmanship, 800 m3 Ferrous Concrete C25, 5000 m2 Floor Coating and Other Works. The duration of the work is 300 (three hundred) calendar days from the place delivery.

Be the first to comment

Leave a response

Your email address will not be published.


*