Construction of Reinforced Concrete Retaining Wall and Drainage Channel at Irmak Zonguldak Line

construction of reinforced concrete retaining wall and drainage channel on the river zonguldak line
construction of reinforced concrete retaining wall and drainage channel on the river zonguldak line

Irmak Zonguldak Line Between Km: 355 + 055 - 355 + 300 Reinforced Concrete Retaining Wall And Drainage Channel Construction Tender Result

Irmak - Zonguldak Line Km: 2 + 2019 - 496065 + 307.013,79 Between the Turkish State Railways Enterprise 403.857,51nd Regional Purchasing Service Directorate (TCDD) with the limit value of 355/055 KIK and the limit value of 355 TL and the approximate cost of 300 TL 20 companies submitted bids for the tender for the construction of the Drainage Channel and, according to the uncertain result, RAMAZAN TEXT KALYONCU won the tender with a bid of 307.209,69 TL. The 2 companies participating in the tender made a bid below the limit value.

The tender covers normal ready-mixed concrete pouring (including concrete transport) and other works in the C 607,35 / 3 compressive strength class, produced or purchased at the 30 m37 Concrete batching plant and printed with a concrete pump. The duration of the work is 120 (one hundred twenty) calendar days from the delivery of the place.

Be the first to comment

Leave a response

Your email address will not be published.


*