When will Sabiha Gökçen Tavşantepe Metro Line open?

sabiha gokcen tavsantepe metro line when emergency
sabiha gokcen tavsantepe metro line when emergency

It is announced that the new Sabiha Gökçen Tavşantepe Metro Line, which is highly anticipated, will be put into service by 2020.

Current M4 Kadıköy-Tavşantepe metro line is the operation that will be allocated to Sabiha Gökçen Airport direction after Tavsantepe. It will be combined with the M10 Pendik-Sabiha Gökçen Airport line coming from Pendik at Fevzi Çakmak station and a joint operation will be made in this section.

When will Sabiha Gökçen Tavşantepe Metro Line open?

M16.03.2015 Tavşantepe-Sabiha Gökçen metro line, which was started to be constructed on 4, was spent on 169.500.000 € under Gülermak-YSE Ordinary Partnership contractor. 7.5km length, 70.000 passenger capacity and 12 min transportation time of the project will open on 2020 said.

Istanbul Rail Metro Tram Map

The first phase of the line was completed in 1 and Kadıköy was opened to service with 21,7 stations in the section of 16 km between Kartal and Kartal. With the construction of Yakacık-Adnan Kahveci, Pendik and Tavsantepe stations, the second phase of the line was also completed. With the 2nd stage, the length of the line reached 2 km and the number of stations increased to 26,5. An average duration of the line is 19 minutes. The metro, which starts at 82:06.00 in the morning, continues to operate until 24.00:4. Every XNUMX minutes, passengers save time.

Line, KadıköyStarting from, it sits on the D100 route in Acıbadem region and follows this route until Tavsantepe. On the line, there are 52 vehicles (13 trains) capacity warehouses and a 32-vehicle maintenance workshop between Maltepe and Nursing Home stations and in the Maltepe Station area. The entire line was built underground, including warehouse and workshop areas.

Station Structures

The tunnels of the line, Kadıköy TBM between Kozyatağı and Kartal - Kaynarca; Between Kozyatağı and Kartal, it was excavated by the NATM method. Bostancı Station has an additional rail line and two side platforms, considering the need for alternative operation. All other stations are built as side platforms. The station is 180 meters long and has a structure suitable for 8-train operation. The facility has 259 escalators and 70 elevators. Access service is provided with 30 turnstiles, 315 of which are designed to allow passengers with disabilities.

System Safety and Security

Kadıköy - Smoke and passenger evacuation scenarios were prepared for the adverse events that may occur in Tavsantepe Metro Line and simulations were made and tested. With a total of 991 cameras at the stations, the system is constantly monitored, controlled and inspected by security guards.

The signaling of the line and the storage area has a mobile communication based Mobile Block system. The signaling system is Thales CBTC system and trains have driverless parking.

All equipment used in the construction of the line is selected from materials that are resistant to high temperature and do not emit toxic gases. In the event of fire, to ensure the evacuation of the passengers as soon as possible and safely; There is a reliable smoke control and evacuation system in accordance with the standards, especially NFPA, which can operate fully automatically.

Kadıköy In Tavsantepe Metro Line, the energy supply of the entire system is made from 3 different points. In the event that all three feed points are disabled, generators at 2 different ends are activated. With the introduction of the generators, all the trains in the tunnel are transported to the nearest station and the evacuation of the passengers is provided. In such a situation that the energy supply cannot be provided and the generators fail; lighting system and electronic control systems can be fed for 3 hours via uninterrupted power supplies.

Transportation Systems Integration

  • Kadıköy At the station, T3 Kadıköy - Moda Tram Line, city lines, sea buses and sea engines,
  • At Ayrılık Fountain Station, Marmaray,
  • At Ünalan Station,
  • In Pendik Station, transfer can be made to Pendik High Speed ​​Train Station via IETT buses.

Kadıköy Tavsantepe Metro Stops

  • Kadıköy
  • Ayrilik Cesmesi
  • Bitter almond
  • Ünalan
  • Göztepe
  • Yenisahra
  • Kozyatağı
  • Bostanci
  • Küçükyalı
  • Malta
  • nursing home
  • Rose water
  • Esenkent
  • Hospital-Justice
  • Soganlik
  • Kartal
  • View Yakacik's Full Profile
  • Pendik
  • Tavşantepe

Today in History: London Underground Opened

December 10 is the 344th day of the year (345th in leap years) according to the Gregorian calendar. There are 21 days left until the end of the year. Railway 10 December 1923 Turkish National Railways [more...]

Warm and Elegant Women's Boot Models

Boots, which are among the indispensable parts of the winter season, stand out with their stylish appearance and functional use that keeps your feet warm. The woman who brings different styles with her [more...]

In Vitro Fertilization Treatment: A Promising Journey

In vitro fertilization treatment stands out as one of the most promising developments in the field of reproductive health in recent years. This treatment is for women who cannot have children naturally for various reasons. [more...]

Bursa weather forecast for 15 days

Saturday, December 9; The day in Bursa will be cloudy and rainy; heavy rain in places, sleet and snow in high areas (above 1300 m). [more...]

Cargo Volume Transported by Rail in Xinjiang Reached 200 Million Tons

"China Railway Urumqi Group" announced that the cargo volume transported by rail in China's Xinjiang Uyghur Autonomous Region has reached 200 million tons since the beginning of the year. Iron in the region [more...]

Ali Babacan's Mother Güneri Babacan Passed Away

Güneri Babacan, mother of Democracy and Progress Party (DEVA) Party Chairman Ali Babacan, passed away. DEVA Party Chairman Ali Babacan met his father Hilmi on November 6. [more...]

Singapore Airlines and İGA Istanbul Airport Focus on Sustainability

Singapore Airlines organized a workshop at the "İGA Istanbul Airport Zero Waste Center" within the framework of its cooperation with İGA Istanbul Airport. Sustainability and environmental issues of both organizations [more...]

Motorcycle Enthusiasts Will Hold Their Breath in Sakarya

"Sakarya Continental Super Enduro" race, which motorcycle enthusiasts are waiting with bated breath on Sunday, December 10th, organized by the Metropolitan Municipality, which hosts exciting races in every branch of sports. [more...]

Groundbreaking for Oruçreis Urban Transformation Project

Groundbreaking Ceremony of 2 Houses within the scope of the 618nd Stage of Oruçreis Urban Transformation Project, in cooperation with the Ministry of Environment, Urbanization and Climate Change and Kayseri Metropolitan Municipality, [more...]

New Squares for Cities Affected by the Earthquake

Mehmet Özhaseki, Minister of Environment, Urbanization and Climate Change, in addition to disaster residences and village houses in the regions affected by the earthquake; will beautify the silhouettes of cities, revitalize commercial life, [more...]

Otokar's Electric Microbuses Hit the Italian Roads

Otokar, the leader of the Turkish bus market, continues its rise in Europe regarding sustainable and environmentally friendly transportation solutions. Comfortable for millions of passengers with tens of thousands of buses on the roads of nearly 60 countries, [more...]

TAYSAD Maintenance Conference Discussed Retrofit and Renewal Applications

The Maintenance Conference, organized for the ninth time this year by the Association of Vehicle Supply Manufacturers (TAYSAD), was held with the theme of "Retrofit and Renewal Applications in Maintenance". Underlining the importance of continuity in production [more...]
done :8
done :8

Comment

  1. I talked to the Ministry of Transport today and the company responsible for the excavation extended the time until 20.09.2021.

Leave a response

Your email address will not be published.


*