Machine Butt Welding and Aluminothermite Rail Welding

machine butt welding and aluminothermite rail welding
machine butt welding and aluminothermite rail welding

TCDD 2, 4, 6 and 7 Regional Directorates of 1924 Machine Butt Welding and 7790 Aluminothermite Rail Welds total 9714 rail welds as a result of the tender.

Turkish State Railways Directorate (TCDD) 2019 / 308700 GCC numbered, 13.564.182,96, 2, 4, 6, 7 and 1924 Regional Directorates with 7790 and 9714 number of Machine Supply and 7 number of Aluminotherm Ray Rail for XNUMX The firm has offered.

The companies participating in the tender and their offers are as follows;

1-Hüseyin Alpan, Ali Alkın Türkmen 8.631.008,00 TL
2-Mehmet Şerafettin Pehlivan 8.721.436,00 TL
3-İstanbul Ray Railway Construction San.ve Tic.Ltd.Şti 8.975.900,00 TL
4-Revan İnşaat Mining Motor Vehicles Rental Petrol Turizm San.ve Tic.Ltd.Şti 9.759.960,00 TL
5-Li-Ma Construction Cleaning Tourism Tourism Industry and Trade Limited Company 11.989.000,00 TL
6-Technical Rail Systems Landscape Construction Engineering Industry San.ve Tic.Ltd.Sti 12.211.100,00 TL
7-Ekapark Construction Industry and Trade Limited Company 13.083.600,00 TL

Tender, 1924 Pieces of Butt Welding (Machine, Rail Length> 72 M) 6590 Pieces of Aluminothermite Rail Welding and Stress Removal (Termite Gap, Rail Length> 72M) 1200 Pieces of Aluminothermite Rail Welding and Stress Removal (Sequential Welding, Rail Length = <72 M) covers their work. The duration of the work is 12 (twelve) calendar days from the place delivery.

Be the first to comment

Leave a response

Your email address will not be published.


*