The Republic of Turkey State Railways (TCDD) The General Directorate of Electrification and Plant Installation work within the scope of the Eskisehir-Kütahya, Balıkesir railway line, construction completed Mezitler-Nusrat (Balikesir) station cross the railway line to 13 February 2019 Volt high-voltage warning since 27.500 was made.
Because of the high voltage to be cut to the line, it is dangerous to travel under the electric train overhead lines, to touch the poles, to climb to the poles, to approach the conductors and to touch the wires falling to the ground.
Be the first to comment