Railway to Dursunbey Organized Industrial Zone

dursunbey osbye
dursunbey osbye

Work has begun in the Organized Industrial Zone, which will change the fate of Dursunbey. In Turkey, the first time into the future as well OSB 8 hatlık studies to determine the location for the rail logistics station was completed.

2015 yearly process started in 8 In the 3 and a half years, XNUMX started the construction of the lower and upper buildings in Dursunbey Organized Industrial Zone. After the tender held in June, the construction and excavation work started in the OIZ, which was undertaken by Güvenç Yapı.

Train Line Will Reach To The Foot Of The Manufacturer

First time in Turkey, which will enter into ASD and load up logistics station to be used for transportation related to the investigation who Bahçav Mayor Ramadan, District Governor Emrullah James Smith, State Railways 7. Regional Manager Adem Sivri came to OIZ with senior managers of the railways and technical team. The delegation exchanging views on the location of the 8 station, which will be held here, determined the 111.000 square meter area within the OSB area as the Logistics center. The logistics station, which will provide a great advantage for the manufacturer, will bring the railway line up to the foot of the companies that will export. Commenting on the comments after the Mayor Ramazan Bahçavan, OIZ's great value added to the logistics station said they made the final decision. Dursunbey OSB'da reminding the first digging President Bahçavan, OSB in the logistics station to be held in the 8 pieces rail line, 50 ton loading cranes and loading and unloading ramps will take place, he said. Mayor Bahçavan; “We came here about the latest revised plans. Here, we are trying to make trouble in hydrant projects so that our citizens do not have problems in agricultural lands. Burada

Dursunbey Governor Emrullah Temizkan said that OSB is the most important project in Dursunbey, which is in the high incentive zone. James Smith; Aşama In this context, the fact that logistical support will be activated with the support of State Railways is an important step for the activation of OIZ. Today topographic determination was performed with the authorities. We will be the followers of the project as our Mayor, Municipality and District Governor. Başkan It was learned that the interest of investors in the OIZ, where excavation and infrastructure works continued, is increasing day by day.

Be the first to comment

Leave a response

Your email address will not be published.


*