Çayırova Traffic Training Park Ended

cayirova traffic training ends in parkinda
cayirova traffic training ends in parkinda

Xnumx year by changing the face of the town with the giant part of his giant Çayırova'ya modern and liveable city identity that gives the City of Çayırova Traffic Education Park, which began construction in recent months, came to an end. Traffic Education Park, which is an important project for children to reach the traffic awareness at a young age, is being done in the fast growing districts.

Kocaeli's Largest Traffic Training Park in Çayırova

2 Million 360 Thousand 360 TL cost added to the center of the center, Aksa neighborhood next to Çayırova Imam Hatip High School in the 8 acres of modern physical structure and fully equipped position was deployed. 4 will be the biggest of Kocaeli when the plant is completed in such a short period of time and after all the details of the traffic training are considered. The students who are educated in Çayırova will be provided with traffic awareness, practice of traffic rules at a young age, and contribute to the emergence of a youth who can think empathically in traffic. The facility will be given practical traffic training with 5.000 students every year.

Mayor Demirci; ”Our children will learn traffic awareness at an early age“

Traffic education in the park with children who want to instill traffic consciousness Demirci said, the project is progressing rapidly Akse Mahallesi'nde. In the project they started in order to create a conscious generation, Demirci said that they are considering a lot of details; 7 meter bike track, 350 meter driving trail, 800 m400 traffic training building, 2 m120 children's playground, 2 m180 amp, 2 meter and 2500 m2 will create a green field. When completed, Demirci also stated that he will be in the training areas such as pedestrian crossings, pedestrian overpasses, signalized intersection, uncontrolled junction, roundabout, level crossing, tunnel, cross road, bus stops, underpass, overpass, hospital, fire brigade and school crossings. He also stated that the works were intensified in order to complete the project in a short time.

Be the first to comment

Leave a response

Your email address will not be published.


*