Izmir Metropolitan Municipality has started to manufacture scrap vehicle parking lot in the area of 18 bin 349 square in Menemen for permanent solution to the scrap problem experienced throughout the city. The facility to cost 2.6 million liras will be 495 vehicle capacity and disabled-friendly.
Izmir Metropolitan Municipality has found a solution for scrap vehicles that have been abandoned in streets and streets, industrial sites and green areas, causing pollution. Menemen Kazımpaşa Mahallesi started the construction of a parking lot to be built for “abandoned scrap vehicles” on an area of 18 thousand 349 square meters, located on Seyrekköy Street. The facility, which will cost 2 million 643 thousand liras, will allow the abandoned scrap vehicles to be stored without creating environmental and visual pollution. The parking lot, which has a capacity of 495 scrap vehicles, will be a serious solution to the city's scrap problem. A retaining wall will be built for the facility where the trees will be protected; There will also be an office and toilets for disabled use. The project, the construction of which has started, is planned to be completed and opened for service within 7 months.
Be the first to comment