90 Percent of Mecidiyeköy-Mahmutbey Metro Construction is Finished

It is stated that 2014 percent of the subway construction, which has reduced construction between Mecidiyeköy and Mahmutbey, which has been under construction since 26, is completed and the line will open at the end of 90.

KabataşThere is a short time to open the giant subway line that will start from Mecidiyeköy-Çağlayan-Kağıthane-Nurtepe-Alibeyköy-Yeşilpınar-Veyselkarani-Akşemsettin-Kazım Karabekir-Yenimahalle-Karadeniz Mahallesi-Tekstilkent-Yüzyıl-Göztepe Mahallesi-Mahmutbey route.15 opened in December, Turkey's first driverless metro line after Üsküdar-Ümraniye now the countdown has begun for the Mecidiyekoy Metro line Mahmutbey line. İBB President Mevlüt Uysal announced when to open the Mecidiyeköy-Mahmutbey line.

Started on January 2, 2014, it will significantly relieve Istanbul traffic Kabataş-Mecidiyeköy-Mahmutbey metro line was learned to serve without drivers. The Mecidiyeköy Mahmutbey metro line, which is reported to be 90 percent finished, will be 18 km long and will consist of 15 stations. Mecidiyeköy-Mahmutbey (Şişli-Kağıthane-Eyüp-Gaziosmanpaşa-Esenler-Bağcılar Districts) Metro Line will be capable of carrying 70.000 people in one direction per hour. When the metro line called M7 is opened, Mecidiyeköy station will be the transfer center. Kabataş and passengers coming from Mahmutbey directions, by metro to Yenikapı and Hacıosman directions; Söğütlüçeşme and Beylikdüzü will be able to transfer by metrobus. When the works are completed, Mecidiyeköy station will turn into an underground square. An underground square of 2 thousand square meters will also be created at the station, which is the transfer point of the Yenikapı-Hacıosman metro line by metrobus. The corridors from the metrobus to the metro will be 25 meters wide.

300 THOUSAND PERSON IN THE DAY
When the line is opened, integration with Yenikapı-Hacıosman and metrobus lines will be provided. In the first opening, approximately 300 thousand people are expected to pass through Mecidiyeköy station per day. 240 thousand people Kabataş-Mecidiyeköy-Mahmutbey line is expected to travel between Yenikapı-Hacıosman, 30 thousand people to be distributed to the metrobus and 30 thousand to work areas in the Mecidiyeköy region.

MAHMUTBEY MECIDIYEKOY DISTANCE TO 26
Bagcilar-Mecidiyekoy: 41 min.
Kagithane-Mecidiyekoy: 4,5 min.
Tekstilkent-Mecidiyeköy: 20,5 min.
Besiktas-Mecidiyekoy: 5,5 min.
Başakşehir-Mecidiyeköy: 35,5 min.
Sancaktepe-Mecidiyekoy: 55 min.
Mecidiyekoy-Mahmutbey: 26 min.

110,8 KILOMETRICAL 5 LINE WILL BE OPEN
On the other hand, 2018 47,8 kilometers of 4 metro line is planned to be opened by Istanbul Metropolitan Municipality. Rail systems include; The second stage of Üsküdar-Ümraniye-Çekmeköy-Sancaktepe metro is Ümraniye (Yamanevler) -Çekmeköy section, Mecidiyeköy-Kağıthane-Alibeyköy-Mahmutbey subway, Dudullu-Kayışdağı, İçerenköy-Bostancı subway. -Eyüpsultan-Alibeyköy tram is located.

Another rail system expected to be opened at the end of the year is the 63 kilometer Gebze-Halkalı It is planned as the Marmaray line which includes the transformation of suburban lines into surface metro.

Be the first to comment

Leave a response

Your email address will not be published.


*