Trabzon Railroad Platform SözcüStunning Disclosures from Bu Bulbul

Bülbül: ı Let's talk about Trabzon connection, not the designated railway line Trabzon

Line Specified, Bidding For Details

Trabzon Railroad Platform SözcüSu and Chamber of Mechanical Engineers Branch President Şaban Bülbül, Erzincan-Trabzon Railways said that it is clear where the line will pass in general terms. Bülbül, geç Erzincan-Trabzon rail line in the general sense of where to pass. Erzincan- Kelkit-Torul- Maçka- Trabzon. However, it is not clear where to go through Maçka. It is not clear where Hamsiköy will pass. The tender is for determining this. Yap

Let's Discuss Where to Go in Trabzon

Bülbül, who proposed a new port for the railway, said: b We should discuss this now. Trabzon Central Port can not remove this load. So not enough. In Trabzon, where a new large port is connected. Get a wide space. That's what we need to discuss. Where will this come in Trabzon? What will happen when it is brought to Trabzon, where will we build the center in Trabzon? Where will we build the logistics center? How are we gonna do her harbor connections? We need to discuss these. Otherwise it is not the designated line. Yoksa

TRABZON Railway Platform SözcüSu and Chamber of Mechanical Engineers Branch President Şaban Bülbül said, “Let's talk about the Trabzon connection, not the determined railway line. sü

Bülbül stated that the railway line had become clear and said: “It is clear where the Erzincan-Trabzon railway line will pass in general. Erzincan- Kelkit-Torul- Maçka- Trabzon. However, it is not clear where to go through Maçka. It is not clear where Hamsiköy will pass. The tender was determined. Torul-Erzincan-Trabzon. But where will this go? In the project to be carried out in the direction of the city, where will Hamsiköy pass, will land in Maçka? Are you going to the right of Maçka or from your left? So this was the project auction at the moment. Approximately an 250 kilometer. Erzincan-Bayburt-Çaykara line or Erzincan-Gümüşhane-Giresun line or Erzincan-Rize line will be worked on at the line determination point? No, it's something. Erzincan-Torul-Trabzon railway. And this is where Torul goes. Torul comes from the center, comes from behind, comes down to Torul, wherever he comes from. Railways from Trabzon to Erzincan will be built. Yes true. This is where he's going. He'il go from Zigana. Where will he pass through Zigana? Now these will be determined. In our previous work Bayburtlular said that the Bayburt over. Giresunlular said they come through Harşit Valley. Right now you draw a road from Erzincan to Trabzon, this is Kelkit'ten, Gumushane, Torul'dan passes. This is also explained in detail by the engineering account. Slope, speed, curves will be calculated by calculating. I can not say that passes through the middle of Hamsiköy, passes through Maçka. These discussions are over. Bu

WE WILL DISCUSS WHERE WHERE IS IN TRABZON

Iz We should discuss this now. Trabzon Central Port can not remove this load. So not enough. In Trabzon, where a new large port is connected. Get a wide space. That's what we need to discuss. Where will this come in Trabzon? Is Trabzon ready for this? What will happen when it is brought to Trabzon, where will we build the center in Trabzon? Where will we build the logistics center? How are we gonna do her harbor connections? We need to discuss these. Otherwise it is not the designated line. Yoksa

Source : www.gunebakis.com.t is

Armin

sohbet

    Be the first to comment

    Comments