Nine Metro Lines Will Pass From Bağcılar

President Uysal, who attended the mass opening and groundbreaking ceremony in Bağcılar, said: U Bağcılar will have nine metro lines from our district. Two rail system lines are already in service. The construction of five metro lines continues. We are in the study stage for the two-rail system line. İki

Istanbul Metropolitan Municipality, Bağcılar, the opening of the opening ceremony and the ground-breaking ceremony was held in Bağcılar Children's Traffic Education Park. In addition to the Mayor of Istanbul Metropolitan Municipality Mevlüt Uysal, Tülay Kaynarca, the AK Party Istanbul deputy, Mayor of Bağcılar Lokman Çağrıcı, Bağcılar District Governor Mustafa Elvan, AK Party Bağcılar District Chairman İsmet Öztürk, Mufti of Bağcılar Musa Uzun, District National Education Director Mustafa Yılmaz , children in the traffic education center and many citizens attended the training.

Speaking at the ceremony, President Mevlüt Uysal, Baghdad in the 1992 participated in the election work and therefore also very well-known Bagcılar said. Underlining that Bağcılar has become one of the most popular districts of Istanbul, President Uysal said, “Today, we are going to open the 15 artwork that we have brought to Bağcılar here and we will lay the foundation of two works. Bağcılar in a short time past what is Mecidiyeköy, Bakirkoy what if he will turn to make hope, "he said.

-DOKUZ METRO LINE IS GOING TO BAGGES-
President Uysal stated that they reserved the biggest share in the IMM budget for transportation and that the traffic problem in Istanbul would be alleviated after the planned transportation requests came into force. Gir Bağcılar will have nine metro lines from our district. Two rail system lines are already in service. The construction of five metro lines continues. We are in the study stage for the two-rail system line. With the completion of our metro lines from Mecidiyeköy to Beylikdüzü, from Mecidiyeköy to Bahçeşehir, from Mecidiyeköy to Küçükçekmece, whoever is going to go through Bağcılar will be forced. Hopefully this year, the latest at the beginning of 2019 year Mecidiyeköy-Bağcılar-Mahmutbey line will be opened. When he was opened, the heavy traffic in E5 used to be continued underground through Bağcılar. You support, we, as a response to you as a service we offer. We owe you. Siz

President Uysal stated that they are serving all corners of Istanbul and they continue their investments without losing their speed. 15, which they will open in Bağcılar, will cost 85 Million TL and 2 will be worth 69 Million. President Uysal continued his words as follows: şöyle There are many different investments between our works. From information houses to sports facilities, traffic education center to lower, overpasses, street arrangements, squares in all areas meets the needs. There are also indoor swimming pools and an indoor sports hall.

- WE HAVE TO GIVE TRAINING.
President Uysal said that “Bağcılar Children's Traffic Education Park ini is among the works that they opened and said olduğun They care a lot about the project c and added: ve There is something that we all complain about. There is a phrase called 'Traffic Monster' which we use for people who do not comply with traffic rules between the media and the public. If we live in traffic, the problem we live in traffic problems and do not comply with the rules of traffic due to not know the rules, then we as a municipality as a way to relieve traffic, citizens to move in the traffic lighting and pavement in order to move in the same time we have to give traffic training. Currently, we have a traffic training center in Topkapı as IMM. It gives education to school students for children. We have a total of 120 thousand visitors a year. Let's do these traffic training centers to different regions of Istanbul so that young people can learn the traffic rules without getting the driver's license before they get into traffic. Çocuklar

JOINT WORK WITH THE MINISTRY OF EDUCATION
President Uysal stated that they would increase the number of such training centers to 6 and then they would like to work together with the Ministry of National Education to provide education to the students in traffic education centers. Milli In our districts, our district governor and the district governor of Bağcılar can start to sit and do this. If they start then we can do it in a much more comfortable way in other regions, Eğer he said.

- NEEDS URBAN TRANSFORMATION-
Istanbul Metropolitan Municipality, the city budget for urban transformation, they allocate 1 Billion TL, and in this process, citizens will not follow a path that will certainly not prevent the President Uysal said. Edik As municipalities in the past, we wanted citizens to do it themselves or do it to the contractor for urban transformation. Our citizens became victims, contractors suffered. The fight was not missing at all. For urban transformation, we will not ask anyone for money, but we will not increase the development. So what are we gonna do? 100 square meter house will destroy the house and the 80 square meter will be delivered. We will collect and sell 20s. In this way, 60 - 70 and 80 in some places, 30 cost in some places. The rest of the 40'ın XNUMX'unu XNUMX'ı as we will meet.

After the speeches, President Uysal vi cut the ribbon of the collective opening and mass laying ceremony on the stage. President Uysal later visited Bağcılar Children's Traffic Training Park and watched the children's education.

METRO LINES OF THE PRESIDENT UYSAL CONNECTED BY BAGCILAR:
Lines in Service
Bus Station - Bağcılar Kirazlı - Başakşehir - Olimpiyatköy Metro Line
Kabataş - Eminönü Zeytinburnu Bağcılar Tram Line

Ongoing Lines / 5 Subway Line
24,5 km Kabataş - Beşiktaş - Mecidiyeköy - Mahmutbey metro line (to be completed in 2019)
13 km Ataköy-Basın Ekspres-İkitelli metro (to be completed in 2019)
9,7 km Bağcılar (Kirazlı) -Kucukcekmece (Halkalı) metro line (to be completed in 2020)
Mahmutbey - Bahçeşehir - Esenyurt metro line (revised line)
9 km Bakırköy İDO - Bağcılar Kirazlı metro line-UHDB (to be completed in 2018)

Project Completed Lines
20,9 km Bahçelievler Bağcılar Esenler Sultangazi metro line
7,8 km Şirinevler Mahmutbey tram line

Bagcılar winnings
1. Bağcılar, Mahmutbey Tem Yan Road, Junction and Connection Roads
2. Bağcılar Tavukçu River Bridge (Bağcılar-Bahçelievler)
3. Bagcilar Velioglu Street
4. Hoca Ahmet Yesevi Street and Side Road
5. Mahmutbey Tolls Tem Overpass
6. Bağcılar Press Express East Side Between Ikitelli Junction and Mahmutbey Junction Road 1.500 M
7. Bağcılar Tem Connection Road South Side Road Road - 120 M
8. Maslak Street
9. 1 Km Wastewater and Stormwater Line to Bağcılar Barbaros District
10. Bağcılar Mahmutbey District 165 M Drinking Water Line
11. Bağcılar Century And Mahmutbey Districts 2,4Km Drinking Water Line
12. Bağcılar 1,4 Km Drinking Water Line
13. Bağcılar Traffic Training Track
14. Bagcilar Yenimahalle Parking Area
15. Bagcilar Yildiztepe Mah. Zeminaltı Car Park And Open Market - 353

Foundations
1. Bağcılar Ebubekir Indoor Swimming Pool and Disabled Rehabilitation Center Construction
2. Anafartalar Primary School School Indoor Sports Hall Construction

Be the first to comment

Leave a response

Your email address will not be published.


*