Ankaray, which significantly reduces the traffic load of Ankara, has been serving Ankara residents for 23 years. With the 11 train sets, on the Ankaray line, where an average of 180 trips are made daily between the AŞTİ stop and the Dikimevi stop in Söğütözü, a feverish work begins after the expiry of the trips. Approximately 9 kilometers long and even old rails are cut and replaced with a new one. The workers, who work very carefully and meticulously for the safety of the passengers, compete against the time until the time the expeditions will begin.
Related Articles
Ankara YHT Terminal opens today
Ankara YHT Station is opening today: Ankara YHT Station, a prestigious work of Turkey and Ankara, will be opened today by President Recep Tayyip Erdoğan. Made by TCDD General Directorate [more…]
Motorbike Collided by Train at Sivasta Level Crossing
A Train and a Motorcycle Collided at a Level Crossing in Sivas, 2 Dead: In Sivas, 2 people on a motorcycle that was hit by a passenger train at a level crossing died. The accident occurred around 20.10. [more…]
Estram Team Emergency Drill
Emergency Drill for Estram Team: The personnel working at Eskişehir Light Rail System Operation (Estram) will be given the necessary emergency intervention in case of tram derailment and a possible traffic accident. [more…]
Be the first to comment