New Akhisar Station Opened to Train Traffic

The new Akhisar Gar, which was completed within the scope of the Akhisar City Crossing project, which was initiated a while ago in order to regulate the city traffic in the Akhisar district of Manisa, was opened to train traffic on April 20, 2018.

With the project, the 11 bin 938 meter 13 thousand 4 meters shortened to the 244 bin 7 meters with the completion of the 253 pieces level crossing on a single line railway passing through Akhisar city with the completed variant project.

At the same time, as the new city line is formed around the Yeni Akhisar Train Station, the city minibus will move every 10 minutes.

The departure times of the passenger trains that will pass through the new Akhisar Train Station are as follows:

32010, 06.50, 06.53, departure XNUMX
Train from 22006 to Eskisehir-Basmane, arrival 08.57, departure 09.01

32011, 09.17, 09.20, departure XNUMX
32001 sefger numbered train Basmane-Balıkesir, arrival 10.57, departure 10.59

32002, 12.01, 12, 06, departure XNUMX
72012, 16, 29, departure 16.31

32003 seuer numbered train Basmane-Bandirma City, arrival 16.30, departure 16: 32
32009, 20, 30, departure 20.35

32004, 20.34, 20.39, departure XNUMX
32005, 21.48, 21.50, departure XNUMX

Be the first to comment

Leave a response

Your email address will not be published.


*