Nusaybin Railway rehabilitation project is implemented

Nusaybin Municipality is carrying out a giant project with Nusaybin Railway Improvement Project. With this project, the districts of the district are cleaned, and the image pollution is aimed at eliminating all kinds of wastes that cause harm to human and environmental health. In addition, people are trying to create areas where people can breathe comfortably.

Nusaybin Municipality Environmental Protection and Control Department will carry out the project work and application areas, except for the main road distance to be applied to the length of the distance 1200 m, area 7285 m² and the height of the wall where the height of the bridge starts up 470 m. 728,5 m³ soil will be laid with grass stones and 3000 m will be paved with curb stones and the walls will be painted with multicolored paints. Along the way, 6-8 will be designed with 30 m intervals by using decorative light motifs on the light poles with length of m. However, the area will be cleared by replacing the railway gravels, while the remaining part of the road between Mardin and Midyat Yolu Street will be placed in the garbage cans and benches and the seating areas where people can breathe.

Be the first to comment

Leave a response

Your email address will not be published.


*