High Voltage Warning from TCDD

TCDD from High Voltage Warning: the General Directorate of the Republic of Turkey State Railways (TCDD), the electrification between Paşalı-Boğazköprü stations located between the completion of the Nevsehir-Kayseri their work announced a high voltage from 1 May.

Republic of Turkey General Directorate of State Railways (TCDD), the electrification between Paşalı-Boğazköprü stations which will be announced completion of work 1 27.500 volts since May.

In the statement made at the General Directorate of TCDD, it is stated that the railway electrification line between Paşalı and Boğazköprü will be given 1 Volts AC on Monday, May 09.00, starting from 27:500, “It is under the electric train overhead lines, touching the poles, climbing, approaching the conductors and the ground. Touching the falling wires is dangerous in terms of life and property safety and is announced to our people very much. ”

Be the first to comment

Leave a response

Your email address will not be published.


*