Halic-Unkapani Highway Tunnel Tube Gate Construction tender result

unkapani galata and halic metro tracks will be on the sea traffic tonight
unkapani galata and halic metro tracks will be on the sea traffic tonight

As a result of the tender for Haliç-Unkapanı Highway Tunnel Tube Gateway Construction: The tender for the 2016st Round of the Tender for Haliç - Unkapanı Highway Tunnel Tube Gateway Construction Work, which was held by Istanbul Metropolitan Municipality Infrastructure Services Directorate, was collected on 210419. 1nd round bids were collected on 10.03.2017.

RayHaberAccording to the information received by Bid, the bids and the firms given in the 1st and 2nd rounds are as follows:

1.Tur (10.03.2017)

STFA, Yapı Merkezi, ASL Construction
Unit price jobs: 193.415.735 TL
Lump sum works: 2.106.464.403 TL
Total: 2.299.880.138 TL

Nurol, GAMA, Grandi
Unit price jobs: 186.903.383 TL
Lump sum works: 2.149.496.616 TL
Total: 2.336.400.000 TL

Gülermak, Arcirodon Construction
Unit price jobs: 178.283.227 TL
Lump sum works: 2.211.227.796 TL
Total: 2.389.511.023 TL

Kalyon, Daewoo, İçtaş
Unit price jobs: 585.255.154 TL
Lump sum works: 1.827.511.747 TL
Total: 2.412.765.898 TL

2.Tur (22.03.2017)

STFA, Yapı Merkezi, ASL Construction
Unit price jobs: 191.245.047 TL
Lump sum works: 1.907.697.408 TL
Total: 2.098.942.455 TL

Gülermak, Arcirodon Construction
Unit price jobs: 175.009.888 TL
Lump sum works: 1.975.549.270 TL
Total: 2.150.559.159 TL

Nurol, GAMA, Grandi
Unit price jobs: 172.224.198 TL
Lump sum works: 1.981.430.801 TL
Total: 2.153.655.000 TL

Kalyon, Daewoo, İçtaş
Unit price jobs: 585.255.154 TL
Lump sum works: 1.827.511.747 TL
Total: 2.412.765.898 TL

Be the first to comment

Leave a response

Your email address will not be published.


*