1915 Çanakkale Bridge is finalized

The tender for the Çanakkale Bridge of 1915 was concluded: Transport, Maritime Affairs and Communications Minister Ahmet Arslan announced that the winner was the winner, Daelim (Korea) - Limak - SK (Korea) - Yapı Merkezi OGG. The joint venture group offered a total of 16 years 2 months and 12 days for the bridge and highway. Thus, the group that offered the shortest contract period won the tender.

As it is known, 1915 companies, 4 Japanese, 3 Chinese, 2 Korean, 1 Italian, received specifications for the 24 Çanakkale Bridge, and 10.30 companies submitted bids to the tender held at 15 today.

Here is the 4 group and their tenders

1.Group: As a result of the work of Daelim-Limak-SK-Construction Center 10 billion 354 million 576 thousand 202 TL, 5,5 annual construction period 16 year 2 month 12 days.

2.Group: Ihi-Itochu-Join-Makyol-Nurol-Japan Expressway total investment value 10 billion 494 million 575 thousand 500 Turkish lira, total time 17 year 10 month 24 day.

3.Group: Cengiz Construction-Kolin Construction-CRBC total investment value 10 billion 324 million Turkish liras, total time including construction period 18 year 8 month 19 days.

4.Group: IC İçtaş-Astaldi total investment value 11 billion 575 million 960 thousand TL, total time 18 year 5 month 15 days.

Planned to Open in 2023

1915 Çanakkale Bridge will be the longest suspension bridge in the world with a medium span of 2 thousand 23 meters. The distance between the piers of the bridge will be 2 thousand 23 meters. There will be 2 × 3 vehicle lanes on the bridge. The bridge is planned to be opened in 100, the 2023th anniversary of the Republic.

Be the first to comment

Leave a response

Your email address will not be published.


*