Countdown to 3 Tier Grand Istanbul Tunnel auction

3 Floor countdown to the Greater Istanbul Tunnel tender: studies for Turkey's Resolution will be one of project and construction is completed Istanbul will vağla once more under the sea on both sides of the three-storey Great Istanbul Tunnel Project The countdown has begun for the tender.

Within the scope of survey, project and engineering services, the ground data will be determined by conducting deep drilling operations on land and sea in the 3-storey Grand Istanbul Tunnel Project.

The 3-Decked Grand Istanbul Tunnel will be located under the Bosphorus and there will be both a highway and a railway in a single tube. Two lanes will be built for the railway, upper and lower carriages.

5 will be reached in Sogutlucesme on the Anatolian side of Istanbul from Incirli on the European side with the use of the tunnel which is planned to be completed in the year. On the European side of the Hasdal Junction, on the Anatolian side of the Çamlık Junction by road, around the 40 minute is aimed to pass.

Yıldırım stated that the 7-storey Grand Istanbul Tunnel Project, which Prime Minister Ahmet Davutoğlu shared with the public before the 3th June election, was created in order to relieve the traffic of Istanbul with the cooperation of the Istanbul Metropolitan Municipality and the Ministry of Transport, Maritime Affairs and Communications. He stated that his work will begin.

BE A FIRST IN THE WORLD

The 3-Storey Grand Istanbul Tunnel, which will pass under the Bosphorus, will be constructed in accordance with the railroad, with both road and rail in one tube, with the two-lane tire on the top and bottom, including the arrival and departure.

One leg of the project, which will be the first in the world with the size and scope of the tunnel, is from the high-capacity and fast metro system starting from İncirli on the E-5 axis on the European Side and passing through the Bosphorus to Söğütlüçeşme on the Anatolian Side, and the second leg is the European Side. It will consist of a 2 × 2 lane highway system, which starts from Hasdal Junction on the TEM Highway axis in Istanbul and passes through the Bosphorus and connects to Çamlık Junction on the Anatolian Side.

The Istanbul Mega Project Promotion was held at the Istanbul Congress Center. The new mega project of Istanbul, the “3-Storey Grand Istanbul Tunnel”, will be built as the world's first three-storey tunnel, which includes both the metro line and the two-way highway. With the project, Söğütlüçeşme from İncirli will be reached in 40 minutes by fast metro; It will take 14 minutes by car from Hasdal Junction to Ümraniye Çamlık Junction. With the “3-Storey Grand Istanbul Tunnel” project, promoted by Prime Minister Ahmet Davutoğlu and the Minister of Transport, Maritime Affairs and Communications, Lütfi Elvan, Istanbul will have the world's first three-storey tunnel connecting the metro lines and highway axles.

The tunnel, which is planned to be completed within 5 years after its construction with the Build-Operate-Transfer model, will be reached in a 31-minute metro line from Incirli on the European Side, to Söğütlüçeşme on the Anatolian Side, consisting of 14 stations with a length of 40 kilometers.

Be the first to comment

Leave a response

Your email address will not be published.


*