19 km rail system to Antalya completed in 5 months

The 19 km rail system to Antalya was completed in 5 months: At the opening ceremony in Antalya, the rail system for transportation to EXPO was also introduced.

Antalya Metropolitan Municipality, with the support of the Ministry of Transport, built a 2016-kilometer rail system line in 5 months to reach the EXPO 19 area. The line cost 420 million lira and the 8-rail system vehicle cost 100 million lira.

19 KILOMETER RAILED SYSTEM 5 IN THE MOON

In the first term of the Metropolitan Mayor Menderes Türel kazanThe 2016-kilometer second stage rail system line, which extends the Meydan-Kepez line, which is located in Aksu district, to the EXPO 19 Antalya area, was completed in 5 months.

TRAMVAY NETWORK CITY SARDI

The second stage rail system project starts from the Square and continues along Aspendos Boulevard and ends at EXPO 2016 Antalya stop. In addition, the route is connected to Antalya Airport with an arm of 2.4 kilometers. The system includes a total of 75 stations, each of which is 15 meters long and of a level type. On the other hand, the Metropolitan Municipality, Antalya, 3'i stage to get together rolled up the sleeves. The 3 line between Varsak and Meltem is aimed to be laid this year.

 

Similar Ads

Be the first to comment

Comments