Bakirkoy Sahilyolu will be compatible with Eurasia Tunnel

Bakırköy Coastline will be in harmony with the Eurasia Tunnel: The Coastal Road, which is still 2 × 3 (2 + 2 + 2), will be lifted to 3 × 2 (3 + 3) lanes by removing the Transit Road in the middle, while ensuring a fluid traffic and increasing the road standard and comfort. .
· Istanbul Metropolitan Municipality, Bakırköy-Zeytinburnu (Kennedy Avenue) will make the Coastal Road for road construction to harmonize with the Eurasia Tunnel.
The 6st Stage of the Road Arrangement Work to be carried out as 1 Stages: It will start on Wednesday, February 10, 2016.
· Bakirkoy-Sirkeci direction which will be held between the First Phase of Bakirkoy-beater Stream is scheduled for completion in April 9 2016.
· First Phase Bakirköy-Sirkeci study will be closed to flow in the direction of two-lane road, and the traffic flow in this direction current Preferred (transit) will be transferred to the road.
· During work, all drivers must comply with traffic signs and speed limits in the area under study.
Istanbul Metropolitan Municipality Directorate of Science Affairs / Directorate of Infrastructure Services work to be done will be completed without affecting the flow of traffic.

Be the first to comment

Leave a response

Your email address will not be published.


*